34.1 If the Eng<strong>in</strong>eer-<strong>in</strong>-charge r <strong>in</strong>structs the Contractor to carry out a test not specified <strong>in</strong> the Specification tocheck whether any work has a Defect and the test shows that it does, the Contractor shall pay <strong>for</strong> the testand any samples. If there is no Defect the test shall be a Compensation Event.35. Correction of Defects35.1 The Eng<strong>in</strong>eer-<strong>in</strong>-charge shall give notice to the Contractor of any Defects be<strong>for</strong>e the end of the DefectsLiability Period, which beg<strong>in</strong>s at Completion and is def<strong>in</strong>ed <strong>in</strong> the Contract Data. The Defects LiabilityPeriod shall be extended <strong>for</strong> as long as Defects rema<strong>in</strong> to be corrected.35.2 Every time notice of a Defect is given, the Contractor shall correct the notified Defect with<strong>in</strong> the lengthof time specified by the Eng<strong>in</strong>eer’s notice.36. Uncorrected Defects36.1 If the Contractor has not corrected a Defect with<strong>in</strong> the time specified <strong>in</strong> the Eng<strong>in</strong>eer’s notice, theEng<strong>in</strong>eer will assess the cost of hav<strong>in</strong>g the Defect corrected, and the Contractor will pay this amount.Note: Where <strong>in</strong> certa<strong>in</strong> cases, the technical specifications provide <strong>for</strong> acceptance of works with<strong>in</strong> specifiedtolerance limits at reduced rates, Eng<strong>in</strong>eer will certify payments to Contractor accord<strong>in</strong>gly.37. Bill of QuantitiesD. Cost Control37.1 The Bill of Quantities shall conta<strong>in</strong> items <strong>for</strong> the construction, <strong>in</strong>stallation, test<strong>in</strong>g, and commission<strong>in</strong>gwork to be done by the contractor .37.2 The Bill of Quantities is used to calculate the Contract Price. The Contractor is paid <strong>for</strong> the quantity ofthe work done at the rate <strong>in</strong> the Bill of Quantities <strong>for</strong> each item.38. Changes <strong>in</strong> the Quantities38.1 If the f<strong>in</strong>al quantity of the work done differs from the quantity <strong>in</strong> the Bill of Quantities <strong>for</strong> the particularitem by more than 25 percent, provided the change exceeds 1% of Initial Contract Price, the Eng<strong>in</strong>eershall adjust the rate to allow <strong>for</strong> the change.38.2 The Eng<strong>in</strong>eer-<strong>in</strong>-charge shall not adjust rates <strong>for</strong> changes <strong>in</strong> quantities if thereby the Initial ContractPrice is exceeded by more than 15 percent, except with the Prior approval of the Employer.38.3 If requested by the Eng<strong>in</strong>eer-<strong>in</strong>-charge, the Contractor shall provide the Eng<strong>in</strong>eer-<strong>in</strong>-charge with adetailed cost breakdown of any rate <strong>in</strong> the Bill of Quantities.39. Variations39.1 All Variations shall be <strong>in</strong>cluded <strong>in</strong> updated Programmes produced by the Contractor.40. Payments <strong>for</strong> Variations40.1 The Contractor shall provide the Eng<strong>in</strong>eer-<strong>in</strong>-charge with a quotation (with breakdown of unit rates) <strong>for</strong>carry<strong>in</strong>g out the Variation when requested to do so by the Eng<strong>in</strong>eer-<strong>in</strong>-charge. The Eng<strong>in</strong>eer-<strong>in</strong>-chargeshall assess the quotation, which shall be given with<strong>in</strong> seven days of the request or with<strong>in</strong> any longerperiod stated by the Eng<strong>in</strong>eer-<strong>in</strong>-charge and be<strong>for</strong>e the Variation is ordered.40.2 If the work <strong>in</strong> the Variation corresponds with an item description <strong>in</strong> the Bill of Quantities and if, <strong>in</strong> theop<strong>in</strong>ion of the Eng<strong>in</strong>eer, the quantity of work above the limit stated <strong>in</strong> Sub Clause 38.1 or the tim<strong>in</strong>g ofits execution do not cause the cost per unit of quantity to change, the rate <strong>in</strong> the bill of Quantities shall beused to calculate the value of the Variation. If the cost per unit of quantity changes, or if the nature or43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!