- Page 2 and 3: INVITATION FOR BID(IFB)2
- Page 4 and 5: TABLE______________________________
- Page 8 and 9: (a) copies of original documents de
- Page 10 and 11: A = Maximum value of civil engineer
- Page 12 and 13: C. Preparation of Bids11. Language
- Page 14 and 15: 18.1 The Bidder shall prepare one o
- Page 16 and 17: 24.1 Information relating to the ex
- Page 18 and 19: 33. Notification of Award and Signi
- Page 20 and 21: 37.2 Furthermore, Bidders shall be
- Page 22 and 23: Contractor's BidBID: Hawker's rehab
- Page 24 and 25: Qualification InformationThe inform
- Page 26 and 27: 1.6 Qualifications and experience o
- Page 28 and 29: Integrated Coastal Zone Management
- Page 30 and 31: 2To be used only if the Contractor
- Page 32 and 33: Agreement FormAgreementThis agreeme
- Page 34 and 35: SECTION 3: CONDITIONS OF CONTRACT34
- Page 36 and 37: Conditions of ContractA. General1.
- Page 38 and 39: (5) Conditions of Contract includin
- Page 40 and 41: 16. Contractor to Construct the Wor
- Page 42 and 43: 28.1 The Engineer-in-charge shall e
- Page 44 and 45: timing of the work in the Variation
- Page 46 and 47: 47. Price Adjustment47.1 Contract p
- Page 48 and 49: the Engineer-in-charge shall issue
- Page 50 and 51: (i)(ii)(iii)(iv)(v)“corrupt pract
- Page 52 and 53: d) Maternity Benefit Act 1951: The
- Page 54 and 55: 3. Assignment of the contract may b
- Page 56 and 57:
S.No.Activity3. Consultationand Com
- Page 58 and 59:
S.No.ActivityMeasures to be Impleme
- Page 60 and 61:
Contract DataItems marked "N/A" do
- Page 62 and 63:
ought to the siteby the contractor(
- Page 64 and 65:
The advance shall be repaid from ea
- Page 66 and 67:
GENERAL SPECIFICATIONS1.0 SCOPE OF
- Page 68 and 69:
S. No. IS No. DESCRIPTION1 IS-1200
- Page 70 and 71:
82 IS:296383 IS:300484 IS:3311 Wast
- Page 72 and 73:
Bricks shall be of first class qual
- Page 74 and 75:
e moved around the top edge of the
- Page 76 and 77:
8.9 Bar Bending Schedule:Concrete G
- Page 78 and 79:
9.3 Protections And CuringThe contr
- Page 80 and 81:
DETAILED TECHNICAL SPECIFICATION FO
- Page 82 and 83:
6.1 General:Shoring works shall be
- Page 84:
9.0 SALT GLAZED STONE WARE PIPE, LA
- Page 88 and 89:
2.1.10 Shifting of Underground Serv
- Page 92 and 93:
SECTION 6: Layout Drawings of the w
- Page 94 and 95:
Schedule of Quantities for Beach Am
- Page 96 and 97:
11Single brick flat soling of picke
- Page 98 and 99:
29303132333435H36Applying Exterior
- Page 100 and 101:
cut, both sides polished with two f
- Page 104 and 105:
On Board Point 28Fixing only fan re
- Page 106 and 107:
Cattachment.Legrand2+4 way Enclosur
- Page 108 and 109:
5B67Treatment to the back filling o
- Page 110 and 111:
E151617181920complete including the
- Page 112 and 113:
32G3334papering etc.Priming one coa
- Page 114 and 115:
Supplying & fixing medium gauge GI
- Page 116 and 117:
33343536D3738Supplying & Fixing bul
- Page 118 and 119:
consolidating same by thorough satu
- Page 120 and 121:
attachment in 10 SWG GI (Hot Dip) W
- Page 122 and 123:
arm, lantern, lamp, control gear, a
- Page 124 and 125:
Controlled Cement concrete with wel
- Page 126 and 127:
cement sand mortar (1:4) 20mm thk a
- Page 128 and 129:
etween the 2 layers laying 20mm thk
- Page 130 and 131:
in all sorts of soil and refilling
- Page 132 and 133:
Schedule of Quantities for Building
- Page 134 and 135:
14 GI Pipe ProtectionSupplying & fi
- Page 136 and 137:
4 x 20 x 5mmDimension of sheet meta
- Page 138 and 139:
56B78chemical emulsion. The work sh
- Page 140 and 141:
600 mm X 600 mm X10 mm thick) in fl
- Page 142 and 143:
33H34VOC (Volatile Organic Compound
- Page 144 and 145:
(i) 50 mm19 Supplying, fitting and
- Page 146 and 147:
E29750 mm longSUBHEAD "E" : RAIN WA
- Page 148 and 149:
13 Finishing cable endsFinishing th
- Page 150 and 151:
Supplying and fixing sheet metal (1
- Page 152 and 153:
upto plinth Sqm 137.755Single brick
- Page 154 and 155:
10wire (4 Mts. long), 13 mm diax 80
- Page 156 and 157:
Single fitting typeSchedule of Quan
- Page 158 and 159:
necessary fittings, necessary earth
- Page 160 and 161:
plaster (1:4) on outer face from to
- Page 162 and 163:
terminal connector/ neutral link, e
- Page 164 and 165:
4shuttering and reinforcement, if a
- Page 166 and 167:
NO.1234CIVIL WORKSEarth work in exc
- Page 168 and 169:
upto 6 sqmm Each 2.00c) For 4 coreu
- Page 170 and 171:
Supplying and fixing 5 amps to 32 a
- Page 172 and 173:
a) Upto plinth Cum 59b) Ground Floo
- Page 174 and 175:
22Wood work in upper rails of raili
- Page 176 and 177:
3456(a) With 'S' trapSupplying, fit
- Page 178 and 179:
(A) Single Socketed 3 Meter Lengthi
- Page 180 and 181:
2 Extra for supplying additional wi
- Page 182 and 183:
the GI pipe19 Extra for treatment o
- Page 184 and 185:
) For additional depth beyond 1.5 m
- Page 186 and 187:
i) Ground Floor Sqm 50.97ii) 1st Fl
- Page 188 and 189:
2829303132G3334composed of special
- Page 190 and 191:
2 X 36/0.3 (2.5 sqmm) + 1 X 22/0.3
- Page 192 and 193:
attachment.Legrand2+6 way Enclosure
- Page 194 and 195:
slope and jointing with stiff mixtu
- Page 196 and 197:
456excavation of earth upto 1.50 me
- Page 198 and 199:
) 4 core 4 sqmm cable Set 1257 GI P
- Page 200 and 201:
j) Stenatoforum secundatum Sqm 600.
- Page 202 and 203:
mm. including watering and ramming
- Page 204 and 205:
16171819direction of Engineer-in-ch
- Page 206 and 207:
Schedule of Quantities for Open Are
- Page 208 and 209:
22Supply, fitting & fixing approved
- Page 210 and 211:
shuttering and reinforcement, if an
- Page 212 and 213:
6Supplying, Installation, testing &
- Page 214 and 215:
Note:(1) Item for which no rate or
- Page 216 and 217:
Forms of SecuritiesAcceptable forms
- Page 218 and 219:
PERFORMANCE BANK GUARANTEETo:______
- Page 220 and 221:
BANK GUARANTEE FOR ADVANCE PAYMENTT