10.07.2015 Views

Bid Document for Hawkers Rehab Centre in Digha.pdf - Integrated ...

Bid Document for Hawkers Rehab Centre in Digha.pdf - Integrated ...

Bid Document for Hawkers Rehab Centre in Digha.pdf - Integrated ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(d)(e)The contractor or his identified sub-contractor should possess required valid electrical license <strong>for</strong>execut<strong>in</strong>g the build<strong>in</strong>g electrification works and should have executed similar electrical works total<strong>in</strong>gRupees 55,00,000/- @ <strong>in</strong> any one year.The contractor or his identified sub-contractor should possess required valid license <strong>for</strong> execut<strong>in</strong>g thewater supply/sanitary eng<strong>in</strong>eer<strong>in</strong>g works and should have executed similar water supply/sanitaryeng<strong>in</strong>eer<strong>in</strong>g works total<strong>in</strong>g Rupees 11.00 Lakhs <strong>in</strong> any one year.(@) 2013-2014 price level. F<strong>in</strong>ancial turnover and cost of completed works of previous yearsshall be given weightage of 5% per year based on rupee value to br<strong>in</strong>g them to 2013-2014 pricelevel4.5 B. Each bidder should further demonstrate:(a)availability (either owned or leased or by procurement aga<strong>in</strong>st mobilization advances) of the follow<strong>in</strong>gkey and critical equipment <strong>for</strong> this work:- concrete Mixture … …… ….. 2 Nos.- excavator .. …. …. …. …. .1 No.- needle Vibrator … …. ….. ….5 Nos.- plate Vibrator …. …… ……. … 5 Nos.- truck / Tipper … ……. …… …..2 Nos.- 5 H.P. Water Pump… ….. ….. 2 Nos.Based on the studies, carried out by the Eng<strong>in</strong>eer the m<strong>in</strong>imum suggested major equipment to atta<strong>in</strong> thecompletion of works <strong>in</strong> accordance with the prescribed construction schedule are shown <strong>in</strong> the above list.The bidders should, however, undertake their own studies and furnish with their bid, a detailedconstruction plann<strong>in</strong>g and methodology supported with layout and necessary draw<strong>in</strong>gs and calculations(detailed) as stated <strong>in</strong> clause 4.3 (k) above to allow the employer to review their proposals. Thenumbers, types and capacities of each plant/equipment shall be shown <strong>in</strong> the proposals along with thecycle time <strong>for</strong> each operation <strong>for</strong> the given production capacity to match the requirements.(b)(c)availability <strong>for</strong> this work of a Project Manager with no less than five years' experience <strong>in</strong> construction ofsimilar civil eng<strong>in</strong>eer<strong>in</strong>g works and other key personnel with adequate experience as required; andliquid assets and/or availability of credit facilities of no less than Rs. 2 crore <strong>in</strong> the <strong>for</strong>mat given <strong>in</strong>Section 2.(Credit l<strong>in</strong>es/letter of credit/certificates from Banks <strong>for</strong> meet<strong>in</strong>g the funds requirement etc.) -4.5 C. To qualify <strong>for</strong> a package of contracts made up of this and other contracts <strong>for</strong> which bids are<strong>in</strong>vited <strong>in</strong> the IFB, the bidder must demonstrate hav<strong>in</strong>g experience and resources sufficient to meet theaggregate of the qualify<strong>in</strong>g criteria <strong>for</strong> the <strong>in</strong>dividual contracts.4.6 Sub-contractors' experience and resources shall not be taken <strong>in</strong>to account <strong>in</strong> determ<strong>in</strong><strong>in</strong>g the bidder's compliancewith the qualify<strong>in</strong>g criteria except to the extent stated <strong>in</strong> 4.5 (A) (b, d and e) above.4.7 <strong>Bid</strong>ders who meet the m<strong>in</strong>imum qualification criteria will be qualified only if their available bid capacity is morethan the total bid value. The available bid capacity will be calculated as under:whereAssessed Available <strong>Bid</strong> capacity = ( A*N*1.5 - B )9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!