11.07.2015 Views

DRAFT LTP book.indb - Hurunui District Council

DRAFT LTP book.indb - Hurunui District Council

DRAFT LTP book.indb - Hurunui District Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Draft <strong>Hurunui</strong> Community Long Term Plan 2012 - 2022street lighting for economy of scale effi ciencies, and anotherone for network assessments with BECA.Community Outcomes1. A desirable and safe place to live2. A place with essential infrastructureGoals and Performance MeasuresGoals How we will achieve ourGoalsMaintain the Contract out roaddistrict’s roads to amaintenance andmonitor performancestandard appropriate accordinglyto their usePerformance Measures Current Situation 11/12 12/13 13/14 14/15 15+<strong>Hurunui</strong> roads will comparefavourably with the national ruralroad averages using the measuresshown below:The smoothness of our roadsThe percentage of rough roadsThe pavement roughness forsealed roadsOverall, our roads compared better than thenational average as shown below:Overall, our roads compared betterthan the national average as shownbelow:Smooth travel exposure - <strong>Hurunui</strong>’sroading network is 98% (better than thenational average of 85%The percentage of “rough” roads in<strong>Hurunui</strong> is 5% and the national averageis 9% (a lower fi gure is better)The percentage of “rough” roads in<strong>Hurunui</strong> is 5% and the national averageis 9% (a lower fi gure is better)√ √ √ √√ √ √ √√ √ √ √Undertake a residentssatisfaction surveyResidents consider the overallstandard of road maintenanceto be satisfactory (more than70%)Resident satisfaction levels haveimproved since 2007. In 2011 theywere 73% satisfi ed√ √ √ √Ensure that allbridges are safe andwell maintainedContract out bridgemaintenance andmonitor performanceaccordinglyReplace priority bridgestructures according tothe bridge replacementprogrammeBridge repairs have commencedafter a bridge structural componentreplacement programme was identifi ed√ √ √ √Financial SummaryA fi nancial summary for this activity is shown on the next page.Happy Valley Road, Emergency Preventitive Maintenance93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!