11.07.2015 Views

chapter 6 george ward based planning - George Municipality

chapter 6 george ward based planning - George Municipality

chapter 6 george ward based planning - George Municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Total % Description Challenges / Backlogservice level.• 0.26% of HH’s use gas forlighting purposes• 1 HH utilize solar energyRefuse removal 2 245 HH’s 98.8%Roads & storm water• 98.8%of HH’s receive refuseremoval services above theminimum service level.• HH’s with refuse removalservices represents 4.1% of allHH.• 1.3% HH’s receiving the serviceless frequent.• 23 HH’s use their own refusedump.• 4 HH’s have no access to refuseremoval servicesBacklog: ±4 HH’s• The backlog include: 4 HH’swith no provision of serviceHousing2 032formalhousingstructures• 89.4% of the housingstructures is formal• 3 HH’s live in informalstructuresBacklog: ± 3 HH’s• The backlog include backyarddwellers and structures ininformal settlementsTo be addedCommunity hallsParks & sport fieldsLibrariesServices by other spheres of governmentMulti-purpose centreTo be addedTo be addedHospitals / ClinicsSchoolsCrèchesPolice stationTable 6.15: Ward 3 Service delivery StatusWARD CUSTOMER SATISFACTION SURVEYThe IDP <strong>ward</strong> profiling process (undertaken during the end of 2011 and the beginning of 2012), required thoseattending to complete a survey form in which the performance of the municipality and the standard of servicedelivery and infrastructure in the respective <strong>ward</strong> were to be rated. The table below shows the results of t hissurvey. The “No-response” category highlights the lack of such of facility or lack of access to such facilities withinthe <strong>ward</strong>, or it can highlight the individuals’ un-awareness of such facilities in the <strong>ward</strong>.Category: Excellent Satisfactory Poor No ResponseRoads and Storm water:Maintenance of existing Roads 0% 77.78% 22.22% 0.00%Maintenance of Gravel Roads 0% 22.22% 11.11% 66.67%Maintenance of Storm water ducts 0% 22.22% 0% 77.78%Water and Sanitation:Access to water 66.67% 33.33% 0% 0.00%Access to Sanitation 66.67% 33.33% 0% 0.00%Energy:Page | 86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!