11.07.2015 Views

chapter 6 george ward based planning - George Municipality

chapter 6 george ward based planning - George Municipality

chapter 6 george ward based planning - George Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Total % Description Challenges / Backlogelectricity above the minimumservice level.• 2 HH’s utilize solar energyusing paraffin & candlesRefuse removal 2 220 HH’s 99.4%Roads & storm water• 99.4%of HH’s receive refuseremoval services above theminimum service level.• HH’s with refuse removalservices represents 4.1% of allHH.• 5 HH’s use a communal refusedump.• 7 HH’s have no access to refuseremoval servicesBacklog: ±7 HH’s• The backlog includes: 7 HH’swith no provision of service• 3% of structures are informalstructuresHousing1 737formalhousingstructures77.81.9% is shacks in thebackyard 1.1 % is in an informalsettlement• The 3% informal structuresrepresent 0.89% of all informalstructures within the municipalarea.Backlog: ± 69 HH’s• The backlog include backyarddwellers and structures ininformal settlementsCommunity facilitiesCommunity hallsTo be addedParks & sport fieldsLibrariesServices by other spheres of governmentMulti-purpose centreTo be addedHospitals / ClinicsSchoolsCrèchesPolice stationTable 6.27: Ward 5 Service delivery StatusWARD CUSTOMER SATISFACTION SURVEYThe IDP <strong>ward</strong> profiling process (undertaken during the end of 2011 and the beginning of 2012), required thoseattending to complete a survey form in which the performance of the municipality and the standard of servicedelivery and infrastructure in the respective <strong>ward</strong> were to be rated. The table below shows the results of thissurvey. The “No-response” category highlights the lack of such of facility or lack of access to such facilities withinthe <strong>ward</strong>, or it can highlight the individuals’ un-awareness of such facilities in the <strong>ward</strong>.Category: Excellent Satisfactory Poor No ResponseRoads and Storm water:Maintenance of existing Roads 0% 66.67% 33.33% 0.00%Maintenance of Gravel Roads 11.11% 33.33% 22.22% 33.33%Maintenance of Storm water ducts 0% 0% 0% 100.00%Water and Sanitation:Page | 100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!