Table E-2. Level 2 MonitoringItemManual Building Survey PointQuantity Per Building4 minimumTilt Meter 8Manual Crack MonitorsTBDManual Crack PatchesTBDData Acquisition Station 1Table E-3. Level 3 MonitoringItemManual Building Survey PointQuantity Per Building4 minimumTilt Meter 8GPS Rover or AMTS (with multiple line-<strong>of</strong>sightlocations, Robotic Total Stationmonitoring becomes more economical)2Data Acquisition Station 1Manual Crack MonitorsTBDManual Crack PatchesTBDThe Alaskan Way Viaduct & Seawall Replacement Program March 2010Proposed SR 99 <strong>Bored</strong> <strong>Tunnel</strong> - <strong>Assessment</strong> <strong>of</strong> <strong>Settlement</strong> <strong>Impacts</strong> to Buildings E-16Public Disclosure Request 11-0123 for Elizabeth Campbell - 2nd installment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!