- Page 5 and 6:
Table of Contents1.0 EXECUTIVE SUMM
- Page 7 and 8:
Proposed SR 99 Bored Tunnel -Assess
- Page 9 and 10:
The damage classification for the r
- Page 11 and 12:
2.0 Program Description & Backgroun
- Page 13 and 14:
2.2 Tunnel Project DescriptionThe T
- Page 15 and 16:
2.2.3 North Access Project Descript
- Page 17 and 18:
3.0 Building AssessmentThe tunnel a
- Page 19 and 20:
. History of settlement - based upo
- Page 21 and 22:
4.0 Settlement and Ground Movement4
- Page 23 and 24:
Figure 3. Generalized Transverse Se
- Page 25 and 26:
5.0 Building Response to Excavation
- Page 27 and 28:
Table 2. Building Damage Classifica
- Page 29 and 30:
tunnel axis), the settlement trough
- Page 31 and 32:
6.0 Results of Structural Analyses6
- Page 33 and 34:
Therefore, high-rise buildings alon
- Page 35 and 36:
Table 4. Summary of Building Damage
- Page 37 and 38:
PROPERTY IDPROPERTY ADDRESSAPPROXIM
- Page 39 and 40:
PROPERTY IDPROPERTY ADDRESSAPPROXIM
- Page 41 and 42:
PROPERTY IDPROPERTY ADDRESSAPPROXIM
- Page 43 and 44:
PROPERTY IDPROPERTY ADDRESSAPPROXIM
- Page 45 and 46:
PROPERTY IDPROPERTY ADDRESSAPPROXIM
- Page 47 and 48:
7.0 ReferencesAttewell, P.B.; Yeate
- Page 49 and 50:
Appendix ATunnel Alignment Plan She
- Page 51 and 52:
A1Legend! ! SeawallPiersAreawaysTun
- Page 53 and 54:
T161NOTES :1) ASSESSMENT OF DAMAGE
- Page 55 and 56:
A3LegendMONORAILEBIAreawaysTunnelTu
- Page 57 and 58: Appendix BBuilding Damage Classific
- Page 59 and 60: Figure B-1. Graphical Illustration
- Page 61 and 62: Appendix CBuilding Assessment Forms
- Page 63 and 64: List of Abbreviations Used in Build
- Page 65 and 66: Distance to Tunnel:• Horizontal o
- Page 67 and 68: example, T311 and T312 are the same
- Page 69 and 70: Appendix DBoscardin and Cording Ana
- Page 71 and 72: Table of Contents1.0 B&C ANALYSIS M
- Page 73 and 74: 1.0 B&C Analysis MethodThe building
- Page 75 and 76: Offset, Yδε hLβDeparture from tu
- Page 77 and 78: Figure D-1. Building Location Coord
- Page 79 and 80: 1.00.90.80.7G((X-XT)/KZ)0.60.50.40.
- Page 81 and 82: 2.0 B&C Damage ClassificationsTable
- Page 83 and 84: 3.0 E/G RatioE/G is based upon Tabl
- Page 85 and 86: 4.0 Building HeightBuilding height
- Page 87 and 88: 5.0 Foundation DepthThe analysis to
- Page 89 and 90: Appendix EMonitoringThe Alaskan Way
- Page 91 and 92: Table of Contents1.0 INTRODUCTION .
- Page 93 and 94: 1.0 IntroductionThe potential groun
- Page 95 and 96: 2.0 Basic MonitoringManual survey p
- Page 97 and 98: 3.0 Tilt Meter Monitoring3.1 Goals3
- Page 99 and 100: 4.0 GPS Monitoring4.1 Goals4.2 Impl
- Page 101 and 102: 5.0 Automated Monitoring Total Stat
- Page 103 and 104: 6.0 Distributed Data Acquisition6.1
- Page 105 and 106: The emerging capability of wireless
- Page 107: 7.0 Levels of MonitoringEach buildi