11.07.2015 Views

SR99 Bored Tunnel-Assessment of Settlement Impacts ... - SCATnow

SR99 Bored Tunnel-Assessment of Settlement Impacts ... - SCATnow

SR99 Bored Tunnel-Assessment of Settlement Impacts ... - SCATnow

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Distance to <strong>Tunnel</strong>:• Horizontal <strong>of</strong>fset between the tunnel centerline and the building centroid.Closest Station:• <strong>Tunnel</strong> station at building centroid.<strong>Tunnel</strong> Depth:• Depth to tunnel springline from the surface at the centerline <strong>of</strong> the tunnel.Building Height (From Ground):• The approximate building height from the ground to the main ro<strong>of</strong> plane.Basement Depth (From Ground):• The approximate basement depth from the top <strong>of</strong> the basement slab to thelocation noted.• If there is no basement, the text “at (e.g. main entrance)” has been deleted fromthis field.Record Drawings Source:• In this field only the source <strong>of</strong> the record drawings is listed. For example, if thedrawings are from the City <strong>of</strong> Seattle Department <strong>of</strong> Planning and Development,“DPD Archives” is listed. If the drawings are from the building owner,“Owner’s archives” is listed.• In the Comments section, the drawings that were reviewed are briefly described.For example “Drawings reviewed included a partial set <strong>of</strong> original constructiondrawings, and a complete set <strong>of</strong> drawings from 1995 tenant improvements.”Completeness <strong>of</strong> Record Drawings:• Four selections are possible: Good, Fair, Poor, and None.Subconsultant:The following abbreviations are used for the subconsultants:• Coughlin Porter Lundeen, Inc. (CPL)• Magnusson Klemencic Associates, Inc. (MKA)• KPFF Consulting Engineers, Inc. (KPFF)The Alaskan Way Viaduct & Seawall Replacement Program March 2010Proposed SR 99 <strong>Bored</strong> <strong>Tunnel</strong> - <strong>Assessment</strong> <strong>of</strong> <strong>Settlement</strong> <strong>Impacts</strong> to Buildings C-3Public Disclosure Request 11-0123 for Elizabeth Campbell - 2nd installment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!