11.07.2015 Views

SR99 Bored Tunnel-Assessment of Settlement Impacts ... - SCATnow

SR99 Bored Tunnel-Assessment of Settlement Impacts ... - SCATnow

SR99 Bored Tunnel-Assessment of Settlement Impacts ... - SCATnow

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.0 Building HeightBuilding height is used in the calculation <strong>of</strong> angular distortion and represents theheight <strong>of</strong> the element for which damage predictions are calculated. In somecases, portions <strong>of</strong> the buildings are evaluated separately to identify the worst caseangular distortion value.Table D-3. Building HeightWall ConditionHeight Assumption1. Building superstructure only H = building height above grade2. Building basement only H = foundation height to grade3. Low rise or separate area H = height as appropriate4. Areaway H = areaway height onlyAs can be seen in Figure D-8 when H/L≥0.5 there is nearly no impact upon theresulting calculation <strong>of</strong> β. Furthermore a greater damage state is predicted withsmall H/L, thus a small value <strong>of</strong> H provides a conservative prediction <strong>of</strong> damagestate.The Alaskan Way Viaduct & Seawall Replacement Program March 2010Proposed SR 99 <strong>Bored</strong> <strong>Tunnel</strong> - <strong>Assessment</strong> <strong>of</strong> <strong>Settlement</strong> <strong>Impacts</strong> to Buildings D-13Public Disclosure Request 11-0123 for Elizabeth Campbell - 2nd installment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!