24.11.2012 Views

Toll Today March 2011 - TOLL Group

Toll Today March 2011 - TOLL Group

Toll Today March 2011 - TOLL Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Global Express<br />

<strong>Toll</strong> IPEC Opens New<br />

A$46 Million Logistics<br />

22<br />

<strong>TOLL</strong> IPEC OFFICIALLy CELEBrATED THE oPEninG OF ITS NEWEST FREiGHT HanDLinG FaCiLiTy AT<br />

THE STaTE-oF-THE-aRT CEnTRE WAS OFFICIALLy OPENED By COuNCILLOr CHaRLiE Zannino, MAyOr<br />

1 L-R: Councillor<br />

Charlie Zannino being<br />

shown the new facility<br />

by <strong>Toll</strong> IPEC’s GM<br />

Rodney Johnston.<br />

2 The new reception<br />

at Hazelmere.<br />

3 The official opening<br />

of the site. L-R:<br />

Kenton Muller,<br />

Rodney Johnston,<br />

Councillor Charlie<br />

Zannino and<br />

Shane O’Neill.<br />

4 A panoramic view<br />

of the new depot.<br />

The new 5.4 hectare site at<br />

Hazelmere showcases the latest<br />

in freight distribution technology<br />

and infrastructure. It consolidates <strong>Toll</strong><br />

IPEC’s former Forrestfield facility and<br />

the Courier Australia operations<br />

bringing 430 employees under one roof.<br />

<strong>Toll</strong> IPEC’s new Hazelmere depot<br />

follows the commissioning of a similar<br />

facility in the Brisbane suburb of<br />

Larapinta, opened in February 2010.<br />

The new Perth depot located in one<br />

of the city’s fastest growing industrial<br />

suburbs, continues an ongoing<br />

upgrade of network facilities to ensure<br />

improved productivity and enhanced<br />

service at <strong>Toll</strong> IPEC.<br />

The new facility is designed to handle<br />

a range of freight types including,<br />

hanging fashion garments, fragile<br />

and sensitive freight, overnight priority<br />

and express road freight. It includes<br />

six dock levellers for rear end loading<br />

and unloading, plus space to handle<br />

a large number of side load trailers.<br />

In total the site is designed to process<br />

up to 60 B-doubles a day.<br />

During the official opening, Divisional<br />

Director, Shane o’neill said, “It is less<br />

than 10 years since <strong>Toll</strong> IPEC built its<br />

previous depot in Forrestfield. Over that<br />

period <strong>Toll</strong> IPEC has expanded rapidly<br />

1<br />

and its new depot in Hazelmere is<br />

a clear reflection of both <strong>Toll</strong> IPEC’s<br />

success and overall economic<br />

growth achieved in WA.<br />

2<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!