11.07.2015 Views

warning - Coastal Winair

warning - Coastal Winair

warning - Coastal Winair

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ELECTRODE SETTINGIMPORTANT: These dimensions MUST be observedand verified. (Figure 36)Figure 36D6003TURBULATOR ADJUSTMENT (Figure 37)Set turbulator adjustment for specific input required.A. Loosen NUT (1), and then turn SCREW (2) untilthe INDEX MARKER (3) is aligned with the correctindex number as per the burner set up chart.Figure 375/32” or 4 mmB. Retighten the retaining nut (1).NOTE: Model F3 and BF3: Zero and three are scaleindicators only. From left to right, the first line is 3and the last is 0.NOTE: Model F3 and BF5: Same as above exceptthe scale indicators are 0 and 4 as shown in Figure37.Model F3, F5, and F105/32” to 13/64” or 4 to 5 mm13/64”5 mm321BURNER INSTALLATIONA. Screw the four (4) M8 x 1.25 double end threadedstuds in the four equally spaced threaded holeslocated in the boiler door. Screw the short end of thestud into the boiler door until the stud bottoms. (SeeFigures 38B & 39A, item 3)B. Align the prepunched mounting gasket withthe four (4) threaded studs on the boiler swing door.Push the gasket onto the studs and seat against thedoor. (See Figures 38B & 39A, item 2)C. The burner may now be attached to the boiler byinserting the air tube through the burner access hole(8) and into the appliance, aligning the holes on themounting flange with the threaded studs on the boilerdoor. Push the burner forward until the mountingflange is seated against the gasket.D. Secure the burner to the boiler door with the four(4) locking hex washer head nuts that are includedwith the boiler ship with hardware.E. Visually verify proper air tube insertion and alignmentinto the boiler door. Dimension “B” should be atleast 1/4”. The mounting flange is welded to the airtube and the end cone should align at least 1/4” backfrom the outer edge of the refractory on the inside ofthe boiler door. (See Figures 38A & 39B). The weldedmounting flange provides amignment of the air tube.No further adjustment recorded.1. Mounting Flange (welded to air tube)2. Mounting Gasket3. M8 x 1.25 Double End Threaded Studs, includedwith boiler hardware4. Burner Access Hole4ACOMBUSTIONCHAMBER1BFigure 38A2 3Figure 38b18-CG03D1-440

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!