11.07.2015 Views

All proposals submitted in response to this Request shall be ...

All proposals submitted in response to this Request shall be ...

All proposals submitted in response to this Request shall be ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

For the 11 multi-strand drop cable sites with multiple Anchor or IRU entities <strong>in</strong> the samebuild<strong>in</strong>g, UC2B has run a separate s<strong>in</strong>gle strand patch cable from the OSP fi<strong>be</strong>r term<strong>in</strong>ationpanel <strong>to</strong> the pre-determ<strong>in</strong>ed location for the fi<strong>be</strong>r service box <strong>in</strong> each entity’s space.For sites that received UC2B electronics, once the fi<strong>be</strong>r service box was <strong>in</strong>stalled, the Installerused a 3-meter SC-<strong>to</strong>-SC s<strong>in</strong>gle-strand fi<strong>be</strong>r patch cable <strong>to</strong> connect the Optical NetworkTerm<strong>in</strong>al (ONT) <strong>to</strong> the fi<strong>be</strong>r service box.A. UC2B supplied up <strong>to</strong> two (2) ten-foot Cat 5e Ethernet patch cables for connect<strong>in</strong>gthe Cus<strong>to</strong>mer’s wired devices. At the Cus<strong>to</strong>mer’s request, (on the <strong>in</strong>stallationagreement) a s<strong>in</strong>gle 25-foot Cat 5e patch cable was substituted for one of thetwo 10-foot patch cables. The “Inside” contrac<strong>to</strong>r did not <strong>in</strong>stall any permanentcopper Ethernet cabl<strong>in</strong>g as part of its contract.B. The <strong>in</strong>stallation <strong>in</strong>formation provided <strong>to</strong> the <strong>in</strong>staller by UC2B specified whichfi<strong>be</strong>r strand should <strong>be</strong> connected <strong>to</strong> the ONT at each multi-strand fi<strong>be</strong>r dropcable location. Prior <strong>to</strong> the <strong>in</strong>staller visit<strong>in</strong>g the cus<strong>to</strong>mer site, UC2B configuredand provisioned the correct VLANs on the cus<strong>to</strong>mer’s fi<strong>be</strong>r strands and providedany necessary fi<strong>be</strong>r patch<strong>in</strong>g <strong>in</strong> the neighborhood cab<strong>in</strong>ets or the UIUC nodes.C. UC2B provided the Anchor Institution <strong>in</strong>stallers with an ONT, a Gateway, a fi<strong>be</strong>rservice box, a 3-meter fi<strong>be</strong>r patch cable, a fi<strong>be</strong>r patch cable <strong>to</strong> connect the OSPfi<strong>be</strong>r term<strong>in</strong>ation panel <strong>to</strong> the fi<strong>be</strong>r service box (if necessary) and two Category5e Ethernet cables for each cus<strong>to</strong>mer. The <strong>in</strong>staller supplied any other hardwarenecessary for the <strong>in</strong>stallation. The <strong>in</strong>staller ma<strong>in</strong>ta<strong>in</strong>ed a small <strong>in</strong>ven<strong>to</strong>ry ofmaterials supplied by UC2B such as fi<strong>be</strong>r optic and copper cables <strong>in</strong> variouslengths, as well as fi<strong>be</strong>r service boxes.D. The <strong>in</strong>staller <strong>in</strong>stalled the ONT and ran a series of UC2B–provided tests <strong>to</strong>confirm that it worked correctly with the core Active Ethernet equipment.E. The <strong>in</strong>staller configured the Gateway for both wired and wireless connections.Each cus<strong>to</strong>mer has one SSID for its private Wi-Fi use, and potentially a UC2BnetSSID for a second “community” Wi-Fi SSID. Specific configuration <strong>in</strong>formationwas given <strong>to</strong> the Installer.F. After verification of connectivity through the Gateway with the Installer’scomputer equipment, and all manufacturer and UC2B diagnostic tests had <strong>be</strong>ensatisfied, Installer then connected and configured up <strong>to</strong> two of the cus<strong>to</strong>mer’swired devices and two wireless devices <strong>to</strong> use the Gateway.G. The Installer was capable of configur<strong>in</strong>g the follow<strong>in</strong>g wired devices andconfigured up <strong>to</strong> two wired devices at each location:16Form A-1 10/09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!