11.07.2015 Views

All proposals submitted in response to this Request shall be ...

All proposals submitted in response to this Request shall be ...

All proposals submitted in response to this Request shall be ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

C. The removable outdoor protective sheath was removed from the UC2B provideddrop cable where it entered the build<strong>in</strong>g.D. The s<strong>in</strong>gle-strand <strong>in</strong>door-outdoor fi<strong>be</strong>r drop cable was term<strong>in</strong>ated <strong>in</strong><strong>to</strong> a smallfi<strong>be</strong>r service box, which was mounted <strong>to</strong> a baseboard <strong>in</strong> the build<strong>in</strong>g at a locationpredeterm<strong>in</strong>ed by the cus<strong>to</strong>mer dur<strong>in</strong>g the canvass by UC2B personnel. The fi<strong>be</strong>rservice box was supplied by UC2B.If the predeterm<strong>in</strong>ed location was not suitable, the Installer’s staff worked withthe cus<strong>to</strong>mer <strong>to</strong> determ<strong>in</strong>e a suitable location for the fi<strong>be</strong>r service box. <strong>All</strong> FTTPsites received UC2B electronics, and once the fi<strong>be</strong>r service box was <strong>in</strong>stalled, theInstaller used a UC2B-supplied 3-meter SC-<strong>to</strong>-SC s<strong>in</strong>gle strand fi<strong>be</strong>r patch cable<strong>to</strong> connect the Optical Network Term<strong>in</strong>al (ONT) <strong>to</strong> the fi<strong>be</strong>r service box.E. UC2B supplied up <strong>to</strong> two (2) ten-foot Cat 5e Ethernet patch cables for theCus<strong>to</strong>mer’s wired devices. At the Cus<strong>to</strong>mer’s request, (on the <strong>in</strong>stallationagreement) a s<strong>in</strong>gle 25-foot Cat 5e patch cable may have <strong>be</strong>en substituted forone of the two 10-foot patch cables. The <strong>in</strong>stallation contrac<strong>to</strong>r did not <strong>in</strong>stallany permanent copper Ethernet cabl<strong>in</strong>g as part of tits UC2B contract.F. UC2B provided an ONT, a Gateway, a 3-meter jumper cable, the fi<strong>be</strong>r service boxand Two (2) Cat 5e Ethernet cables for each cus<strong>to</strong>mer. The Installer supplied anyother hardware necessary for the <strong>in</strong>stallation. The Installer ma<strong>in</strong>ta<strong>in</strong>ed a small<strong>in</strong>ven<strong>to</strong>ry of UC2B supplied materials <strong>in</strong>clud<strong>in</strong>g cables <strong>in</strong> various lengths as wellas fi<strong>be</strong>r service boxes.G. The Installer <strong>in</strong>stalled the ONT and ran a series of UC2B–provided tests on theInstaller’s computer <strong>to</strong> confirm that the ONT was communicat<strong>in</strong>g correctly withthe core Active Ethernet equipment <strong>in</strong> the Neighborhood Cab<strong>in</strong>et. Prior <strong>to</strong> theInstaller arriv<strong>in</strong>g <strong>to</strong> <strong>in</strong>stall the fi<strong>be</strong>r drop cable, UC2B personnel patched throughthe MST port for that cus<strong>to</strong>mer <strong>to</strong> the Active Ethernet chassis <strong>in</strong> theNeighborhood Cab<strong>in</strong>et and provisioned the right VLAN(s) for that cus<strong>to</strong>mer onthat MST port.H. The Installer configured the Gateway for both wired and wireless connections.Each cus<strong>to</strong>mer has one SSID for their private Wi-Fi use, and potentially aUC2Bnet SSID for a second “community” Wi-Fi SSID. Specific configuration<strong>in</strong>formation was given <strong>to</strong> the Installer.I. After confirm<strong>in</strong>g connectivity through the cus<strong>to</strong>mer’s UC2B network Gateway,and all diagnostic tests had <strong>be</strong>en satisfied, Installer then connected andconfigured up <strong>to</strong> two of the cus<strong>to</strong>mer’s wired devices <strong>to</strong> the Gateway. Wireddevices eligible for Installer-provided configuration <strong>in</strong>clude:18Form A-1 10/09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!