12.07.2015 Views

Guiding principles for reserve management - NCC Environmental ...

Guiding principles for reserve management - NCC Environmental ...

Guiding principles for reserve management - NCC Environmental ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.2 Funding RequirementsIt is proposed that the following operational 10 and capital 11 budget would be required to implement this SP:KEY PERFORMANCE AREAKPA 1: Biodiversity and heritageconservationCAPEX(R)2013/2014 2014/2015 2015/2016 2016/2017 2017/2018OPEX (R)CAPEX(R)OPEX(R)CAPEX(R)OPEX (R)CAPEX (R)OPEX(R)CAPEX(R)OPEX(R)400,000 100,000 400,000 80,000 200,000 65,000 250,000 65,000 200,000 50,000KPA 2: Sustainable use 1,000,000 50,000 1,500,000 80,000 2,000,000 50,000 500,000 45,000 200,000 45,000KPA 3: En<strong>for</strong>cement, security and accesscontrol2,000,000 100,000 2,000,000 100,000 1,000,000 80,000 500,000 50,000 500,000 50,000KPA 4: Infrastructure and equipment 2,000,000 50,000 2,000,000 100,000 1,500,000 100,000 500,000 80,000 500,000 80,000KPA 5: Stakeholder involvement 0 100,000 0 100,000 0 100,000 0 20,000 0 100,000KPA 6: Administration and planning 0 50,000 0 40,000 0 45,000 0 55,000 0 55,000Total 5,400,000 450,000 5,900,000 500,000 4,700,000 440,000 1,750,000 315,000 1,400,000 380,00010 Operational costs are roughly based on an area-complexity factor (i.e. different cost ranges per ha, based on the level (high, medium or low) of <strong>management</strong> complexity). This was then moderated against documentedexpenditure <strong>for</strong> operational costs in Limpopo’s provincial <strong>reserve</strong>s, wherever available. This was then again moderated against equivalent <strong>reserve</strong>s in Kwa-Zulu Natal and the Western Cape, as well as <strong>reserve</strong>s of SANParksand ECParks, where operating costs have stabilised and are well documented over a period of three to five years.11 Capital budget requirements are roughly based on known costs <strong>for</strong> similar capital investments, either in terms of replacement costs (e.g. vehicles), infrastructure development costs (e.g. cost/ha or cost/km <strong>for</strong> fencing orroads), bulk services (e.g. costs/m <strong>for</strong> pipelines, etc.), or building costs (e.g. cost/m 2 <strong>for</strong> staff accommodation or chalets), etc.Reserve Management Documents: Legalameetse Nature Reserve (Strategic Plan) 60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!