12.07.2015 Views

Baltimore-Washington Parkway Widening Feasibility Study

Baltimore-Washington Parkway Widening Feasibility Study

Baltimore-Washington Parkway Widening Feasibility Study

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Baltimore</strong>-<strong>Washington</strong> <strong>Parkway</strong> <strong>Widening</strong> <strong>Feasibility</strong> <strong>Study</strong>Alternatives Definition3.0AlternativesDefinitionThe alternatives development process is a critical step in the feasibility study. It involved an interactiveand interdisciplinary approach for identifying, screening and evaluating alternatives for the potentialwidening of the B-W <strong>Parkway</strong>. This section describes the processes used during the initial identificationand preliminary screening of the widening alternatives.3.1MethodologyThe alternatives development process consisted of the following steps:1. Review of background Information.2. Determination of roadway deficiencies; existing and projected traffic operational performance;and environmental, transportation, land-use, demographics and community features.3. Identification of a reasonable range of alternatives from stakeholder input.4. Preliminary screening of highway alternatives based on criteria that addresses environmental,transportation, and physical design factors.5. Selection of widening options for further development.Using this methodology, a reasonable range of highway-oriented physical and operational improvementwidening alternatives for the B-W <strong>Parkway</strong> corridor was developed. Options were selected based ontheir ability to address the study’s goals and objectives for both current and future year conditions.3.1.1BackgroundInformationBackground information was taken from existing pertinent legislation, reports, plans, studies, maps, andother available information pertaining to transportation, land use, and environmental conditions in thestudy area from the study’s stakeholders, including the NPS, Maryland SHA, the District of ColumbiaDepartment of Transportation, the MWCOG, the <strong>Baltimore</strong> Metropolitan Council (BMC), the Maryland-National Capital Park and Planning Commission, Prince George’s County, Maryland, and other sources asnecessary. This data was inventoried and documented in the Existing Conditions Technical Report,which is included as an appendix to this document.3.1.2PotentialSafetyIssuesandRoadwayDeficienciesThe scope of this feasibility study did not include a detailed safety analysis or interchange operationalanalysis. However, through a review of as-built roadway plans, stakeholder comments, aerialphotography, photos, and field observations of the study area, the team has identified some potentialconcerns that would require further study if this work advances further in the project developmentprocess.In general, the B-W <strong>Parkway</strong> corridor meets applicable geometric standards and guidelines for limitedaccess highways. The following areas of concern have been identified as potential topics for additionalexamination.27 November 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!