12.07.2015 Views

ECO - 65 OWNER'S MANUAL - Drolet

ECO - 65 OWNER'S MANUAL - Drolet

ECO - 65 OWNER'S MANUAL - Drolet

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

e) Installation through side of masonry chimney(Refer to figure 16)1. Position the stove, adhering to the clearances in Figures 1 & 2. Mark the center of the hole where the pipe isto pierce the masonry chimney.2. It will be necessary to break out the masonry around the location of the pipe center mark. Use a 5-inchdiameter hole for 4-inch pipe.3. Measure and build chimney top plate. Cut out holes for chimney and the outside air pipe.4. Install the tee on the bottom of the vertical pipe system and lower it down the chimney until the centerbranch of the tee is level with the center of the hole in the masonry, as shown in Figure 16.5. Install and seal the top plate from step 3 with non-hardening mastic. Slip the storm collar over the pipe, andwhile holding the pipe at the proper elevation, affix the collar with a minimum of three ¼” stainless steelsheet metal screws. Seal all joints and seams around the collar.6. Connect the horizontal pipe by pushing it through the hole in the masonry and lining it up with the branch inthe tee. Push the pipe into the tee while twisting it to lock it into the tee.7. If desired, once the horizontal pipe is in place, the space between the pipe and masonry may be filled withhigh-temperature grout.Install the trim collar. An adjustable pipe length and adapter may be needed to finish the connection to thestove.Figure 16Venting through side ofmasonry chimney

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!