12.07.2015 Views

VRIOGS 002.1 Railway Station Design Standard and Guidelines

VRIOGS 002.1 Railway Station Design Standard and Guidelines

VRIOGS 002.1 Railway Station Design Standard and Guidelines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>VRIOGS</strong> <strong>002.1</strong> Revision A 257.6.2 Staff <strong>and</strong> Operational FacilitiesThe operational facility that may be located within the station entry in order to manage thestation operations <strong>and</strong> systems is the station ticket office. The necessity of this facility isdetermined by the station category (see Table 4), <strong>and</strong> its location <strong>and</strong> sizing determinedby the current <strong>and</strong> future staff numbers <strong>and</strong> patronage numbers. Any facility shall belocated <strong>and</strong> sized with regards to the priority for unimpeded passenger circulation <strong>and</strong>operational efficiency.Staff <strong>and</strong>OperationalStaff <strong>and</strong> Operational Facility SelectionMetropolitanRegionalPremium Host Unstaffed Premium Modal CommuterHubRegionalTicket Office Yes No No Yes Yes Yes NoTable 4: <strong>Station</strong> Entry - Staff <strong>and</strong> Operational Facility Selection.Detailed requirements for staff operational areas facilities are addressed in Section 10.17.6.3 Passenger FacilitiesThe necessity of the passenger facilities provided at a station entry is determined by thestation category (see Table 5). The facilities location <strong>and</strong> sizing is determined by thecurrent <strong>and</strong> future patronage numbers. All facilities must be located <strong>and</strong> sized with regardsto the priority for unimpeded passenger circulation.PassengerFacilitiesCustomerToiletsEnclosedWaitingAreasPublicTelephoneMetropolitanPassenger Facility SelectionPremium Host Unstaffed Premium ModalHubRegionalCommuterRegionalYes Yes No Yes Yes Yes NoYes No No Yes Yes Yes NoYes Yes YesAs specifiedby the AROAs specifiedby the AROAs specifiedby the AROAsspecifiedby the ARORubbish bins Yes Yes Yes Yes Yes Yes YesRetailAs specified As specified As specifiedYes No NoNofacilitiesby the ARO by the ARO by the AROCommercialAsAs specified As specified As specifiedVendingYes Yes Yesspecifiedby the ARO by the ARO by the AROMachinesby the AROTicket Window Yes Yes No Yes Yes Yes NoSmart CardVendingMachineYes Yes YesFare PaymentDevice Yes Yes YesSt<strong>and</strong> aloneEnquiremachineYes No NoTable 5: Passenger Facility Selection.As specifiedby the AROAs specifiedby the AROAs specifiedby the AROAs specifiedby the AROAs specifiedby the AROAs specifiedby the AROAs specifiedby the AROAs specifiedby the AROAs specifiedby the AROAsspecifiedby the AROAsspecifiedby the AROAsspecifiedby the ARONOTE: This document is controlled only when viewed on the DOT Engineering <strong>St<strong>and</strong>ard</strong>s website. Any othercopy of this document is uncontrolled, <strong>and</strong> the content may be inaccurate.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!