12.07.2015 Views

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Third</strong> <strong>Party</strong> <strong>Inspection</strong> <strong>Guidelines</strong> <strong>for</strong> CARE <strong>Inspectors</strong>SECTION THREE (Cont'd)dryvitCARE Site <strong>Inspection</strong> Checklist WorksheetThis section should be completed each time the CARE inspector visits the project site. Attach toSection Two at the completion of each visit.F. Insulation Board Applicable N/A<strong>Inspection</strong>/Installation(Cont'd)c) Length = +/- 1.6 mm (+/- 1/16 in)d) Squareness < 0.8 mm (1/32 in) in300 mm (12 in)e) Flatness < 0.8 mm (1/32 in) in a1.2 m (4 ft) radius.f. Notes:YES NO N/A2. Installationa. Date of Installationb. Ambient air temperature °F or °Cc. Wall temperature °F or °Cd. Material identification - adhesive1) Manufactured and supplied by <strong>Dryvit</strong>Systems, Inc.2) Name of product:3) Batch number:4) Proper type <strong>for</strong> installed substrate5) Mixing proportiona) Lump free Type I or II Portlandcementb) Clean potable water6) Notch trowel 9.5 mm wide x 51 mmhigh x 38 mm apart (3/8 in wide x 1/2 inhigh x 1 1/2 in apart) used to applyadhesive7) Adhesive applied with ribbons runningvertically along width of insulationboard

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!