Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit
Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit
Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Third</strong> <strong>Party</strong> <strong>Inspection</strong> <strong>Guidelines</strong> <strong>for</strong> CARE <strong>Inspectors</strong>SECTION THREE (Cont'd)dryvitCARE Site <strong>Inspection</strong> Checklist WorksheetThis section should be completed each time the CARE inspector visits the project site. Attachto Section Two at the completion of each visit.YES NO N/AC. <strong>Inspection</strong> of Installed Applicable N/ASubstrate1. Substrate type:2. Thickness of sheathing: inch(es)3. Framing c to c: inch(es)4. Date of sheathing installation (Mo/Day/Yr):a. Correct orientation of sheathingb. Sheathing joints are offset from corners ofopeningsc. Edges of sheathing are supported byframing membersd. Fastener type and spacing per contractdocumentse. Paper faced gypsum facing laps to theinsidef. Paper faced gypsum paper firmly attachedto coreg. Glass mat gypsum sheathing oriented withgold coating outwardh. Wood based sheathings properly gappedat edges and ends5. Dimensional toloerancea. Flat within 6.4 mm (1/4 in) in a 1.2 m (4 ft)radius6. Damage exceeding 9.5 mm (3/8 in)7. Clean surface, dry, free of contaminants8. Notes: