12.07.2015 Views

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Third</strong> <strong>Party</strong> <strong>Inspection</strong> <strong>Guidelines</strong> <strong>for</strong> CARE <strong>Inspectors</strong>SECTION THREE (Cont'd)dryvitCARE Site <strong>Inspection</strong> Checklist WorksheetThis section should be completed each time the CARE inspector visits the project site. Attach toSection Two at the completion of each visit.F. Insulation Board Applicable N/A<strong>Inspection</strong>/Installation(Cont'd)o. Expansion joints positioned at properlocationp. Minimum thickness of insulation board atbase of aesthetic reveals is 19 mm(3/4 in)q. Projecting features incorporate properslope requirementsr. Projecting features pattern per contractdocumentss. Fasteners installed into framing membersor nailable substratet. 100% of insulation board (EPS) sanded flatu. Slivers of insulation board/approved foamspray installed where requiredv. Notes:YES NO N/AG. Application of Base Applicable N/ACoat and Rein<strong>for</strong>cingMesh1. <strong>Inspection</strong> of Installed Insulationa. Surface of insulation board has beensanded to remove all irregularitiesb. All insulation boards are tightly butted orfilled with insulating materialc. Surface of insulation board is clean, dry,flat and all sanding dust is removedd. There is no yellowing of insulation boardfrom extended exposuree. Damaged insulation board has beenreplaced

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!