12.07.2015 Views

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

Third Party Inspection Guidelines for Inspectors Technical ... - Dryvit

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Third</strong> <strong>Party</strong> <strong>Inspection</strong> <strong>Guidelines</strong> <strong>for</strong> CARE <strong>Inspectors</strong>SECTION THREE (Cont'd)dryvitCARE Site <strong>Inspection</strong> Checklist WorksheetThis section should be completed each time the CARE inspector visits the project site. Attach toSection Two at the completion of each visit.I. Flashings (NotApplicable N/Acomponents of <strong>Dryvit</strong>EIF System)1. Flashing at openings installed per contractdocuments and <strong>Dryvit</strong> Installation Details2. Cap flashing installed as soon as practicalafter installation of <strong>Dryvit</strong> system3. Cap flashing sloped toward roof4. Roof wall intersection diverters are installedper contract documents and <strong>Dryvit</strong> installationdetails <strong>for</strong> the specific EIF System installed5. Flashing provided in sections is properlysealed6. Flashing extends a minimum of 64 mm(2 1/2 in) over the surface of the <strong>Dryvit</strong> system7. Flashing includes a drip edge8. Exposed vertical leg of flashing is tight againstthe surface of the <strong>Dryvit</strong> system9. Notes:YES NO N/AJ. Sealants (Not part of Applicable N/A<strong>Dryvit</strong> EIF System):1. Finished joint width is in accordance withcontract documents2. Joint width is uni<strong>for</strong>m3. <strong>Dryvit</strong> Weathercoat or Weatherprime®applied over base coat to receive sealant4. Joint to be sealed is clean, dry and frostfree5. Date of this installation:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!