12.07.2015 Views

Specifications for a Quality Label for Paint, Lacquer and ... - Qualicoat

Specifications for a Quality Label for Paint, Lacquer and ... - Qualicoat

Specifications for a Quality Label for Paint, Lacquer and ... - Qualicoat

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

- Be<strong>for</strong>e application, each coating (of a system or supplier) must be tested <strong>for</strong>resistance to boiling water, followed by an adhesion test (see section 2.4).- During application, resistance to boiling water should be tested, followed by anadhesion test every 4 hours.Coating plants which decide to use such treatments must in<strong>for</strong>m their nationalassociation, or QUALICOAT if there is not a national association.3.2.4 Alternative pre-treatmentsAlternative pre-treatments are treatments other than the pre-treatments describedabove.Such alternative pre-treatments may not be used until they have been approved byQUALICOAT, following a test programme.Coating plants which decide to use such treatments must in<strong>for</strong>m their nationalassociation, or QUALICOAT if there is not a national association. The coating plants<strong>and</strong> suppliers must comply with the special specifications set out in Appendix A6.3.3. Pre-treatment <strong>for</strong> electrophoretic coatingsAll parts to be coated must be cleaned by adapted treatment in an alkaline or acidsolution. The cleaned surfaces must be rinsed in demineralised water with a maximumconductivity of 30 µS at 20°C prior to coating. The surfaces must be wettable withwater.The parts must be coated immediately.All workers h<strong>and</strong>ling pre-treated parts must wear clean textile gloves to avoidcontamination of the surface.3.4. Oven drying3.5. StovingAfter pretreatment <strong>and</strong> be<strong>for</strong>e the application of coating, the parts must be driedthoroughly in an oven. For this purpose, a drying oven must be installed in each plant.The conditions between the spray booth <strong>and</strong> the oven must be absolutely free of dust<strong>and</strong> contamination.All coatings must be stoved immediately after application. The oven must bring themetallic parts to the required temperature <strong>and</strong> maintain them at that temperature <strong>for</strong> thewhole length of the stoving time.The temperature of the metallic parts <strong>and</strong> the stoving time must match the valuesrecommended in the manufacturer's technical specifications.It is recommended to keep the difference in temperature between the coldest <strong>and</strong>hottest sections of the treated parts below 20°C.It must be possible to measure the temperature over the whole length of the oven.QUALICOAT SPECIFICATIONS 21 11 th Edition

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!