12.07.2015 Views

Air Pollution Control Permit - Guam Solid Waste Receivership

Air Pollution Control Permit - Guam Solid Waste Receivership

Air Pollution Control Permit - Guam Solid Waste Receivership

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Guam</strong> EPATitle V Federal Operating <strong>Permit</strong>Layon Municipal <strong>Solid</strong> <strong>Waste</strong> Landfill, Inarajan, <strong>Guam</strong><strong>Permit</strong> No. PO-DOSII.D.1 The provisions of NSPS subpart WWW apply at all times, except during periods ofstartup, shutdown, or malfunction, provided that the duration of startup,shutdown, or malfunction shall not exceed 5 days for collection systems and shallnot exceed 1 hour for treatment or control devices. [40 CFR §60.755(e)]II.D.2 The following procedures shall be used for compliance with the surface methaneoperational standard as provided in 40 CFR §60.753(d). [40 CFR §60.755(c)]a. After installation of the collection system, the owner or operator shallmonitor surface concentrations of methane along the entire perimeter ofthe collection area and along a pattern that traver~es the landfill at 30meter intervals (or a site-specific established spacing) for each collectionarea on a quarterly basis using an organic vapor analyzer, flame ionizationdetector, or other pOltable monitor meeting the specifications provided in40 CFR §60.753(d).b. The background concentration shall be determined by moving the probeinlet upwind and downwind outside the boundary of the landfill at adistance of at least 30 meters from the perimeter wells.c. Surface emission monitoring shall be performed in accordance withsection 4.3.1 ofUSEPA Method 21, except that the probe inlet shall beplaced within 5 to lO centimeters ofthe ground. Monitoring shall beperformed during typical meteorological conditions.d. Any reading of 500 parts per million or more above background at anylocation shall be recorded as a monitored exceedance and the actionsspecified below shall be taken. As long as each ofthe specified actionsare taken, the exceedance is not a violation of the operational requirementsof 40 CFR §60.753(d).(l) The location of each monitored exceedance shall be marked andthe location recorded.(2) Cover maintenance or adjustments to the vacuum of the adjacentwells to increase the gas collection in the vicinity of eachexceedance shall be made and the location shall be re-monitoredwithin J0 calendar days of detecting the exceedance.(3) Ifthe re-monitoring of the location shows a second exceedance,additional corrective action shall be taken and the location shall bemonitored again within 10 days of the second exceedance. Ifthere-monitoring shows a third exceedance for the same location, theaction specified in 40 CFR §60.755(c)(4)(v) shall be taken, and no100f39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!