GuarnEPATitle V Federal Operating PennitLayon Municipal <strong>Solid</strong> <strong>Waste</strong> LandfiII, Inarajan, <strong>Guam</strong><strong>Permit</strong> No. FO-OOSIV.P.5 This permit (a) does not release the permittee from compliance with otherapplicable statutes of <strong>Guam</strong>, or with applicable local or federal laws, regulations,or ordinances, and (b) shall not constitute, nor be constmed to be an approval ofthe design of the source. [GAPCSR, Sections lI04.2(e) and 1104.12(11)]IV.P.6 The permittee shall not use as a defense in an enforcement action that it wouldhave been necessary to halt or reduce the permitted activity to maintaincompliance with the terms and conditions of this permit. [GAPCSR, SectionI 104. 12(9)(C)]IV.P.7 The filing of a request by the permittee for a permit termination, suspension,reopening, or amendment, or a notification of planned changes or anticipatednoncompliance does not stay any permit condition. [GAPCSR, Section1104. 12(9)(D)]IV.P.8 This permit shall become invalid with respect to any authorized constmction ifconstruction is not conmlenced as follows:a. Within thirty (30) days of permanent discontinuance of the construction,modification, relocation or operation of any permitted air pollutionemission source, the responsible official shall report the discontinuancein writing to the Administrator.b. For phased constmction projects, each phase shall commenceconstmction within eighteen (18) months of the projected and approvedcommencement dates in the permit. [GAPCSR, Sections 1l04.5(b),1l04.5(c), ,md 1l04.12(9)(F)]IV.P.9 GEPA may extend the time periods specified in Condition IV.P.8 of this permitupon a satisfactory showing that an extension is justified. Request for anextension shall be submitted in writing to GEPA. [GAPCSR, Section 1104.5(d)]IV.P.IO The permittee may request confidential treatment of any records in accordancewith Section 1102.7 of the GAPCSR. [GAPCSR, Section 1104. 12(9)(J)]IV.P.ll The terms and conditions included in this permit, including any provisiondesigned to limit a source's potential to emit, m'e federally enforceable unlesssuch terms, conditions, or requirements are specifically designated as notfederally enforceable. [GAPCSR, Section 1104.14]390f39
GuarnEPA<strong>Air</strong> Pollutiou Coutrol <strong>Permit</strong>Statement ofBasis<strong>Guam</strong> Layoll LandfillGUAM EPATITLE V FEDERAL OPERATING PERMITSTATEMENT OF BASISLayon Municipal <strong>Solid</strong> <strong>Waste</strong> Landfill<strong>Permit</strong> No. FO-020Facility ill:Facility Name:Mailing Address:Responsible Official:Title:Phone Number:Contact Name:Title:Phone Number:Person ResponsibJe forRecordkeeping:Title:Phone Number:FO-020Layon Municipal <strong>Solid</strong> <strong>Waste</strong> LandfillP.O. Box 2977Inarajan, <strong>Guam</strong> 96932Christopher A. Lund; Gershman, Brickner, & Bratton, Inc.(GBB)Receiver for the Court(671) 646-3249Christopher A. Lund; Gershman, Brickner, & Bratton, hlC.(GBB)Receiver for the Court(671) 646-3249Christopher A. Lund; Gershman, Brickner, & Bratton, Inc.(GBB)Receiver for ilie Court(671) 646-3249I. PurposeThe purpose of this engineering evaluation is to identify all applicable requirements,determine if the facility will comply with those applicable requirements, and provide thelegal and factual basis for proposed permit conditions.II.III.Facility LocationThe Layon LandfilJ facility is located in Inarajan, <strong>Guam</strong>.Description of Facility OperationsThe facility is a waste disposal facility that accepts and processes the municipal solid wastefrom the Island of <strong>Guam</strong> under ilie SIC 4953 .. The sources iliat have the potential to cause