12.07.2015 Views

Air Pollution Control Permit - Guam Solid Waste Receivership

Air Pollution Control Permit - Guam Solid Waste Receivership

Air Pollution Control Permit - Guam Solid Waste Receivership

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GuarnEPATitle V Federal Operating <strong>Permit</strong>Layon Municipal <strong>Solid</strong> <strong>Waste</strong> Landfill, Inarajan, <strong>Guam</strong><strong>Permit</strong> No. FO-OOSa. Identification of the specific equipment to be taken out of service, aswell as its location and permit number;b. The expected length of time that the air pollution control equipment willbe out of service;c. The nature and quantity of emissions of air pollutants likely to be emittedduring the shutdown period;d. Measures such as the use of off-shift labor and equipment that will betaken to minimize the length of the shutdown period; ande. The reasons why it would be impossible or impractical to shut down thesource operation during the maintenance period. [GAPCSR, Section1102.8; SIP, Section 4.3]IV.0.3 A copy of applicable correspondence or records submitted to GEPA shall beprovided to the USEPA pursuant to Section 1104.15 of the GAPCSR. [GAPCSR,Section 1104.12(9)(I)]IV.OA Within thirty (30) days of permanent discontinuance of the operation,modification, relocation, or construction of any of the above units, the responsibleofficial shall report the discontinuance in writing to the Administrator.[GAPCSR, Section 1104.5(a)]IV.P.Miscellaneous ConditionsIV.P.l Unless specifically identified, the terms and conditions contained in this permitare consistent with the applicable requirement on which each term or condition isbased. [Section 49107(7)(c)(2) of Chapter 49, Part 2, Division 2, Part 1 of Title10 of the GCA]IV.P.2 This permit, or a copy thereof, shall be maintained at or near the source for whichthis permit was issued and shall be made available for inspection upon request.[GAPCSR, Section 1104.4(a); SIP, Section 3.12]IV.P.3 This permit shall not be willfully defaced, altered, forged, counterfeited, orfalsified. [GAPCSR, Section 1104.4(b); SIP, Section 3.13]IV.PA The facility covered by this permit shall be constructed and operated inaccordance with the application, and any information submitted as part of theapplication, for this permit. There shall be no deviation from this permitcondition unless additional or revised plans are submitted to and approved byGEPA, and the permit is amended to allow for such deviation. [GAPCSR,Section 1104.12(12)]380f39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!