12.07.2015 Views

Air Pollution Control Permit - Guam Solid Waste Receivership

Air Pollution Control Permit - Guam Solid Waste Receivership

Air Pollution Control Permit - Guam Solid Waste Receivership

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Guam</strong> EPATitle V Federal Operating <strong>Permit</strong>Layon Municipal <strong>Solid</strong> <strong>Waste</strong> Landfill, Inarajan, <strong>Guam</strong><strong>Permit</strong> No. FO-OOSIII.H. Annual Emissions Reporting RequirementsIII.H.I The reporting period for the annual emissions, including emissions from theemission units identified in Condition IT.A.I of this permit, shall be from JanuaryI to December 31 of each calendar year. All reports shall be submitted to GEPAalong with the annual fee due. The report shall be mailed to [GAPCSR, Section1l04.24(c)]:Administrator<strong>Guam</strong> Environmental Protection Agency<strong>Air</strong> and Land Division<strong>Air</strong> <strong>Pollution</strong> <strong>Control</strong> ProgramP.O. Box 22439 GMFBarrigada, <strong>Guam</strong> 96921All applicable correspondences and records with this permit submitted to GEPAshall have duplicate copies forwarded to:Director, <strong>Air</strong> Division (Attn: AIR-5)U.S. Environmental Protection Agency75 Hawthorne StreetSan Francisco, CA 94105III.H.2 The permittee shall retain the information submitted, including all emiSSionscalculations. These records shall be in a permanent form suitable for inspection,retained for a minimum of five (5) years, and made available to GEPA uponrequest. [GAPCSR, Section 1l04.12(7)(H)]IILH.3 Any information submitted to GEPA without a request for confidentiality shall beconsidered public record. [GAPCSR, Section 1102.7]III.HA The permittee may request confidential treatment of specific information bysubmitting a written request to the Administrator identifying the specificinformation that is to be accorded confidential treatment. [GAPCSR, Section1102.7(b)]III.I.Fee PaymentIII.I.! The permittee shall submit fees in accordance with GAPCSR, Sections] 104.21through 1l04.24. [GAPCSR, Section lI04.12(9)(K)]III.L2 The permittee shall complete and submit the Annual Fee Calculation Worksheet,including all emissions calculations, with the required aBnual fee. The permitteeshall make copies for future use. [GAPCSR, Section 1104.24(1)]ll1.I.3 Annual fees shall be paid in full: [GAPCSR, Section 1104.24 (a)]280f39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!