12.07.2015 Views

Annual Report 2010 - Scana Industrier ASA

Annual Report 2010 - Scana Industrier ASA

Annual Report 2010 - Scana Industrier ASA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

27<strong>Annual</strong> <strong>Report</strong> <strong>2010</strong> <strong>Scana</strong> <strong>Industrier</strong> <strong>ASA</strong>Important new orders in <strong>2010</strong><strong>Scana</strong> entered a contract with Ulstein Verft AS for thesupply of remote controlled gear and propeller systemsfor seismic vessels for the shipping company Polarcus.The design is Ulstein SX134 from Ulstein Design &Solutions, having the characteristic X-Bow hull. Thiscontract strengthens <strong>Scana</strong>’s position as market leaderin the advanced ship operations segment. The deliveryis for a market segment tending towards eco-friendlyand flexible systems through the use of diesel-electricsolutions.<strong>Scana</strong> entered a contract with STX OSV AS for thedelivery of remote controlled gear and propeller systemsfor three anchor handling vessels for Norskan Offshorein Brazil. The ships will be built in Brazil, commissionedby Petrobras. This is a strategically important deliveryfor the activity in Brazil, in the segment for advancedoffshore vessels.<strong>Scana</strong> signed a contract with the Turkish shipyardTersan Shipyard for the delivery of complete propulsionsystems, consisting of gears, propeller, tunnel thrustersand remote control for a longliner for the shippingcompany Frøyanes AS. The propulsion system is adiesel-electric solution with Siemens electromotors,giving the vessel a fuel saving solution with greatflexibility.vessel. The delivery consists of two controllable pitchpropellers and one fixed pitch propeller with an axlesystem, each propeller with a diameter of 1,700 mm.With the polish Gdansk Shiprepair Yard “Remontowa”,a contract was signed to deliver tunnel thrusters fortwo supply vessels, with an option for deliveries foran additional two ships. The vessels will be operatedby Ezra Holding Ltd. from Singapore. The deliveryfor each ship is four controllable pitch thrusters withremote control and DP-demands. This is a delivery to acommitment area in an important geographical marketand confirms <strong>Scana</strong>’s position as an international playerin a demanding market.In <strong>2010</strong>, we delivered 2 out of a total of 8 deliveries forbulk ships at Nantong Mingde Heavy Industry StockCo. Ltd. in China. The delivery was for controllable pitchpropellers and tunnel thrusters. The shipyard is thepolish Polsteam.<strong>Scana</strong> has signed several contracts for single units oftunnel thrusters and controllable pitch propellers.A contract for propeller delivery was signed withNorthern Shipyard in Poland for equipment to a rescue

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!