12.07.2015 Views

November 2004 (PDF 11.6 MB) - Barrick Gold Corporation

November 2004 (PDF 11.6 MB) - Barrick Gold Corporation

November 2004 (PDF 11.6 MB) - Barrick Gold Corporation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B3.2 Short-term method• details of equipment used (include latestcalibration date), equipment settings and thesampling rate of the meter• a statement justifying the choice ofmonitoring site and period, including theprocedure used to choose the site, havingregard to the definitions of ‘noise- sensitivelocation(s)’ and ‘most-affected location(s)’described in Section 3.1.2• a description of the dominant andbackground noise sources at the site• a record of weather conditions duringmonitoring• the measured background noise levels.NSW industrial noise policy72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!