Figure 1.2.The overall process of assessing and managing noise impactsDetermine project-specific noiselevels Figure 1.3 (Section 2)Existing noise levels(Section 3)Predict level of noise from the source anddetermine noise impact(Section 6)Figure 1.4Modifying factors(Section 4)Figure 1.5Meteorology(Section 5)Section 6.3.1Noise impactpresent?NOYESConsider mitigation options(Section 7)Project-specificnoise levelsmet?YESNOAcceptable level of impactFigure 1.6negotiated(Section 8)Existing sitesNew sitesNoise reduction plan/licenceconditions (Section 10)Consent/licence conditiondetermined Figure 1.6 (Section 9)Performance monitoring(Section 11)Note: Dotted line indicates an optional processNSW industrial noise policy9