20.3 A bid, determined as substantially non-responsive will be rejected by the<br />
Tendering <strong>of</strong>ficer and shall not subsequent to the bid opening be made responsive by<br />
the bidder by correction <strong>of</strong> the non-conformity also the Tendering <strong>of</strong>ficer shall not be<br />
bound to show the reasons/causes <strong>of</strong> rejection <strong>of</strong> the bid.<br />
20.4 The Tendering <strong>of</strong>ficer may waive any minor infirmity or non-conformity or<br />
irregularity in a bid, which does not constitute a material deviation, provided such<br />
waiver, does not prejudice or affect the relative ranking <strong>of</strong> any bidder.<br />
21. Evaluation & comparison <strong>of</strong> substantially responsive BIDs:<br />
21.1 On the due date <strong>of</strong> bid opening the tendering Authority will open the Technical<br />
bid specified in the bid document. If the bidder is eligible and meets all the conditions<br />
to participate in the tender, then only the technical evaluation will be done on the<br />
same day and the financial bid will be opened at a later date. Only those Financial<br />
BIDs shall be opened which are found techno-commercially compliant.<br />
21.2 The tendering Authority will make the technical/financial evaluation <strong>of</strong> the eligible<br />
bidders.<br />
21.3 Financial bid evaluation will be based on the net composite Price <strong>of</strong>fered in the Price<br />
schedule i.e., Section 9. The evaluation <strong>of</strong> the L-1 bidder will be decided based on the<br />
lowest quote.<br />
21.4 The Tendering <strong>of</strong>ficer shall evaluate in detail and compare the bids previously<br />
determined to be substantially responsive pursuant to clause 20 above.<br />
21.5 Arithmetical errors shall be rectified on the following basis. If there is a<br />
discrepancy between the unit price and total price that is obtained by multiplying the<br />
unit price and quantity, the unit price shall prevail and the total price shall be corrected<br />
by the tendering authority. If there is a discrepancy between words and figures, the<br />
amount in words shall prevail. If the bidder does not accept the correction <strong>of</strong> the<br />
errors, his bid shall be rejected.<br />
21.6 Tendering <strong>of</strong>ficer may negotiate with L1 bidder only or can make counter <strong>of</strong>fer<br />
against the prices quoted by any bidder.<br />
21.7 Apart from the existing cellular customers, the data <strong>of</strong> prospective customers<br />
enrolled during the contract period may have to be scanned and documented.<br />
21.8 The tendering authority will issue the APO/Work order and fix the target date to<br />
complete the work. The performance <strong>of</strong> each vendor will be assessed on weekly<br />
basis. If the bidder fails to meet the target and complete the work within the specified<br />
date, the tendering authority has the right to cancel that APO/PO/ Work Order and<br />
allot the same work to other bidders.<br />
21.9 There are 5 SSAs in J&K Telecom Circle and the scanning will be carried out<br />
at 11 locations presently. The tendering authority has every right to vary the no. <strong>of</strong><br />
scanning locations and cancel work order, if the bidder fails to meet the targets.<br />
22. Contacting the Tendering Authority:<br />
22.1 Subject to Clause 19 above, no bidder shall try to influence the Tendering<br />
<strong>of</strong>ficer on any matter relating to its bid, from the time <strong>of</strong> the bid opening till the time the<br />
contract is awarded.<br />
22.2 Any effort by a bidder to influence the Tendering <strong>of</strong>ficer or any other <strong>of</strong>ficer<br />
authorized on his behalf w.r.t the bid evaluation, bid comparison or contract award<br />
decisions shall result in the rejection <strong>of</strong> the bid.<br />
36