12.07.2015 Views

invitation for bids - Gail

invitation for bids - Gail

invitation for bids - Gail

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

i) Weather Protection Jacket.Aluminum jacketing shall be used as weather protection overinsulation unless otherwise specified and shall be ASTM B209 alloy3003 H16 or IS 737 designation 31000 (Old NS3) condition H3 <strong>for</strong> flatsheets. Cladding shall be coated on the side in contact with theinsulation with a bitumen anti-corrosive paint.For all piping - 0.71mm (22 SWG) Flat.j) Ancillary Materials:For securing fibrous insulation on piping: Band 22 SWG thick x12mm (min) wide, Aluminum.On equipment: Band 22 SWG Thick x 20mm wide Aluminum.k) Rivets required <strong>for</strong> metal jacket securement shall be the expanding theAluminum "POP" blind eye type, 9.5 mm long x 5 mm diameter.l) Screws required <strong>for</strong> metal jacket securement shall be cadmium platedsteel self tapping type A no.8 dia x 12mm long to BS 4176 completewith neoprene washers under the head or GI screws if cadmiumplated screws are not available.m) To ensure perfect water proofing all the cladding joints shall bepacked with sealing materials which may either be in the <strong>for</strong>m of aelastomeric sealing compound or fibre based bituminous felt strips.13.0 APPLICATION:-a) Surfaces to be insulated and shall be thoroughly cleaned dried andmade free from loose scale, oil or grease. It shall be the contractor'sresponsibility to remove loosely adhering scale and dirt be<strong>for</strong>eapplying insulation.b) Corrosion Prevention: Carbon steel and low alloy piping andequipment with normal operating temperature of 125 0 C and belowshall be protected against corrosion by painting with a 20 microns(min) dry film thickness of heat resistant Aluminum paint suitable <strong>for</strong>the above temperature.c) Insulation shall be finished, bevelled and weather proofed at allterminal points where it is required to remove bolts etc. withoutdamage to the insulation.d) Double layer: Insulation shall be required when the insulationthickness is greater than 75mm. Insulation installed in two or more23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!