12.07.2015 Views

invitation for bids - Gail

invitation for bids - Gail

invitation for bids - Gail

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

e) Metal Sealant: Any cladding joint shall be provided with metal sealantcon<strong>for</strong>ming to Benjamin Foster 95-44 or equivalent.f) PU based primer paint shall be applied in two layers 25 microns DFTeach on the cleaned surface of equipment. Be<strong>for</strong>e applications offoaming, the painted surface shall be totally dry.g) On horizontal equipment the spacing shall not be more than mm oncircumstances and not more than 750 mm axially.h) Cladding shall be fabricated and provided over the PU spacer blocksand aluminum strips using self tapping screws and Pop rivets with anover lap of not over 50 mm or one corrugation in both longitudinaland circumferential directions. SS hoop bands shall be providedaround the cladding.mm.i) All metal jacketing joints examined <strong>for</strong> gaps. In case of any defective orbulged insulation the affected portion shall be cut, cleaned andre<strong>for</strong>ming to acceptable standard shall be per<strong>for</strong>med.16.0 L.D. Clause shall be applicable as per GCC.17.0 SAFETY CODE:The Contractor shall at his own expense arrange <strong>for</strong> safety provisions as required by theOfficer-in-charge, in respect of all facilities in connection therewith. In case the Contractor failsto make arrangements and provide all facilities in connection therewith, the Officer-in-chargeshall be entitled to do so and recover the cost thereof from the running bills of the Contractor.18.0 SAFETY AND SECURITY:-The contractor shall comply with safety & security rules & regulations and other rules laid downby the GAIL, & GAIL safety/security regulations. It shall be the duty/responsibility of thecontractor to ensure the compliance of fire safety , security and regulations by his workers.Disagreement to these rules by the contractors’ personnel will lead to the termination of thecontractor at the risk and expense of the contractor in all respect.19.0. GENERAL CONDITION OF CONTRACT:-General Conditions of Contract as Section VI of this document is part of tender document..Contractors are advised to refer the same be<strong>for</strong>e quoting . It shall be deemed that the quoting,bidders have referred the above during tendering. Contractor shall have to abide by all labourlaws. The GCC shall <strong>for</strong>m part of the tender documents.20.0 SPECIAL CONDITIONS OF CONTRACT TO PREVAIL OVER GCC :-If there is any discrepancy between the GCC & SCC, the Special Conditions of Contract willprevail over GCC .21.0 COMPLIANCE OF LABOUR LAWS & OTHER STATUTORY PROVISIONS:-Contractor shall ensure due compliance of al applicable and governing Industrial and labourlaws, rules and regulations, bye-laws, both of Central and State Govt. and all other local29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!