12.07.2015 Views

invitation for bids - Gail

invitation for bids - Gail

invitation for bids - Gail

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SCHEDULE OF RATESSECTION - VSlnoDescription of work UOM Qty. Unit Rate(Rs)A. Cold Insulation Density 35 KG/CM 31. Thickness 75 mm M2 102. Thickness 100 mm M2 25.5803. Thickness 150 mm M2 174. Thickness 250 mm M2 505. Pipe Size 1 ½ “ Thickness 75 mm M 66. Pipe Size 2” Thickness 75 mm M 67. Pipe Size 3” Thickness 75 mm M 88. Pipe Size 4” Thickness 75 mm M 109. Pipe Size 4” Thickness 150 mm M 610. Pipe Size 1 ½” Thickness 125 mm M 2111. Pipe Size 10” Thickness 125 mm M 1512. Pipe Size 10” Thickness 150 mm M 9B. Hot Insulation Density 140 KG/CM31. Thickness 75 mm M2 112. Pipe Size 2” Thickness 75 mm M 53. Pipe Size 3” Thickness 50 mm M 204. Pipe Size 3” Thickness 150 mm M 85. Pipe Size 4” Thickness 100 mm M 216. Pipe Size 4” Thickness 150 mm M 127. Pipe Size 6” Thickness 100 mm M 108. Pipe Size 8” Thickness 75 mm M 49. Removal of Old Insulation M2 50010. Only Cladding of Insulation M2 20011. Replacement of wooden support Teak FT3 10WoodSERVICE TAXTOTALTotal Amount(Rs)(TOTAL IN WORDS RUPEES _________________________________________________________)Note:1. The Service Tax shall be reimbursed on actual basis as per service tax rules, on submission ofdocumentary proof.Place:Date:Signature of Authorised SignatoryName:Designation:Seal:46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!