12.07.2015 Views

Draft Long Term Plan 2012-2022 - Hurunui District Council

Draft Long Term Plan 2012-2022 - Hurunui District Council

Draft Long Term Plan 2012-2022 - Hurunui District Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

www.hurunui.govt.nzCommunity Outcomes1. A desirable and safe place to live2. A place with essential infrastructureGoals and Performance MeasuresGoalsHow we will achieve ourGoalsMaintain the Contract out roaddistrict’s roads to amaintenance andmonitor performancestandard appropriate accordinglyto their useEnsure that allbridges are safe andwell maintainedUndertake a residentssatisfaction surveyContract out bridgemaintenance andmonitor performanceaccordinglyPerformance Measures Current Situation 11/12 12/13 13/14 14/15 15+<strong>Hurunui</strong> roads will comparefavourably with the national ruralroad averages using the measuresshown below:The smoothness of our roadsThe roughness of our roadsThe strength of our roadsResidents consider the overallstandard of road maintenanceto be satisfactory (more than70%)Replace priority bridgestructures according tothe bridge replacementprogrammeOverall, our roads compared better than thenational average as shown below:Overall, our roads compare better than thenational average as shown below:Smooth travel exposure – <strong>Hurunui</strong>’s roadingnetwork is 97%. The national average is 86%(a higher value is better)Overall, our roads compare better than thenational average as shown below:Percentage rough roads in the <strong>Hurunui</strong> is4.2%. The national average is 9.1% (a lowervalue is better)Overall, our roads compare better than thenational average as shown below:The strength of our roads is measured by apavement Integrety Index (PII). The PII forthe <strong>Hurunui</strong> is 96.6% The national average is93.7% (a higher value is better)Resident satisfaction levels have improvedsince 2007. In 2011 they were 73% satisfiedBridge repairs have commenced after abridge structural component replacementprogramme was identified√ √ √ √√ √ √ √√ √ √ √√√√ √ √ √Financial SummaryA financial summary for this activity is shown on the next page.Happy Valley Road, Emergency Preventative Maintenance88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!