12.07.2015 Views

Sustainability Report 2012 - Transnet

Sustainability Report 2012 - Transnet

Sustainability Report 2012 - Transnet

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

In March <strong>2012</strong>, the Minister of Public Enterprises asked all SOCsto implement energy saving initiatives in buildings under theirmanagement. In response, <strong>Transnet</strong> has taken the following steps: divisions and <strong>Transnet</strong> Property to introduce everydayelectricity conservation measures and manage emergencyswitch-off where required; water tanks to heat pumps, power factor correction to controlpeak power consumption, a building management system toreduce air conditioning plant consumption and lightingcontrol, installation of prepaid meters to ensure correctrecovery of electricity consumption, introduction of naturallighting, replacing electrical stoves with gas, introductionof temperature sensors in geysers and in air conditioningsystems and the insulation of piping to retain temperatures; implemented to record electricity use and action plans forevery building in <strong>Transnet</strong> on a monthly basis; being implemented to reach all <strong>Transnet</strong> employees; Management programme are replacing inefficient lighting inspecified <strong>Transnet</strong> buildings; and efficiency in lighting, heating and cooling solutions atits manufacturing sites and depots.The energy efficiency focus for <strong>2012</strong>/13 targets initial savingsper unit of production, wherever immediately feasible, and aimsto improve the Company’s systems, equipment and technologyfor monitoring consumption and savings. These steps will befollowed in subsequent years by more specific energy efficiencymeasures appropriately designed for different parts of thebusiness.COAL LINE100 NEW CLASS 19ELOCOMOTIVES10,0% ENERGYREGENERATEDIRON ORE LINE44 NEW CLASS 15ELOCOMOTIVES20,0% ENERGYREGENERATED<strong>Sustainability</strong> performance: Environmental dividendsEnergyefficiency targets<strong>2012</strong>/13ElectricityefficiencymeasuresTargets <strong>2012</strong>/13% savingson 2011/12DieselefficiencymeasuresTargets <strong>2012</strong>/13% savingson 2011/12Freight Rail traction kWh/ton km 3,0% Litres/ton km 3,0%Freight Rail property kWh/m 2 3,0% n/a n/aRail Engineering kWh/man-hour 4,0% Litres 4,0%National Ports Authority kWh 4,0% Litres –Port Terminals kWh/ton 5,0% Litres/ton km 2,7%<strong>Transnet</strong> Property kWh/m 2 5,0% n/a n/aPipelines n/a 0% n/a n/a<strong>Sustainability</strong> <strong>Report</strong> <strong>2012</strong>71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!