ATTACHMENT 4.5PAGE 28 OF 36Hawaiian Electric Company, Inc.Completed ProjectsAs Of 12/31/2010Total Cost of $500,000 or Greater(PUC Application filed prior to July 1, 2004)DocketNumberItemNumberProjectDescription2010IncurredCostIn-ServiceDateCostReportFiled02-0206 P953900003-0360 Y0D03003-0417 Y48500K3 Boiler Control UpgradeDispatch Center BuildingKamoku 46kV UG Alt Phase 124,52291458,502,4839/19/20073/27/20066/29/201011/15/2007 (a)4/21/2008 (a)8/26/201058,527,920(a) Straggling Cost• Final Cost Report filed 11/29/10