12.07.2015 Views

ANGLO AMERICAN PLATINUM

ANGLO AMERICAN PLATINUM

ANGLO AMERICAN PLATINUM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PLATINUM</strong>Re-alignment and Upgrade of road D4380• Re-align the portion of the D4380 Provincial Road along the boundaries of the farmsSwartfontein 818LR and Overysel 815 LR• 3,8 km of road• After re-alignment , road section will be upgraded to:- 9.4 metre wide tarred road, comprising a 7.4 m tarred surfaced and 1 metre wide gravel shoulders on eitherside.- Road servitude will be 30 metres wide aligned to the Road Agency Limpopo requirements.• Funded by Anglo American Platinum Limited (AMPLATS) as part of its expansion of themining activities at Mogalakwena Mine, and its contribution to the improvement of theroads infrastructure in the vicinity of the Mine8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!