12.07.2015 Views

Download - Andhra Pradesh Municipal Development Project Website

Download - Andhra Pradesh Municipal Development Project Website

Download - Andhra Pradesh Municipal Development Project Website

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Comprehensive Planning of Water Supply Service improvements In the following ULBs (1) Ananthapur <strong>Municipal</strong> Corporation,(2) Chittoor <strong>Municipal</strong>ity and (3) Badvel <strong>Municipal</strong>ityBadvel <strong>Municipal</strong>ity – Detailed <strong>Project</strong> Report (Final) - Environment<strong>Project</strong>Sub-<strong>Project</strong>• Purchase of watertankers• Purchasing of softwareApplicability of Environmental Lawsand Policies<strong>Andhra</strong> <strong>Pradesh</strong> Infrastructure<strong>Development</strong> Enabling Act, 2001Not applicableRemarksApplicable to all urban infrastructureprojects involving private sector involvementin the development, finance, constructionand operation and maintenance phases_____The project proposes to construct town wide infrastructure in the urban areas, where the investmentsintervene with various other infrastructure already in place. In such areas the project implementing agencywill ensure the following clearances before initiating the works.• Clearance from Roads and Buildings Department for cutting roads.• Permission for breaking or shifting of public utilities like sewer lines or water pipe lines from WaterSupply and Sewerage Boards.• Permission and clearance from electricity board for shifting/moving of streetlights and transformersduring execution of project.Since the project components are limited to construction of intake structure over SPVBR (sourceaugmentation), construction of Water Treatment Plant, construction of water storage reservoir, laying ofrising main, and laying of distribution mains, and no components are located within sensitive areas, as perWorld Bank Framework, project is categorized as EB. Therefore limited environmental assessment isrequired.Applicable rules and regulation related to the APMDP entire project and water supply project is shown inTable 1.3.3 -1 above. Now compliance of environmental and forest rules and regulation in respect to projectcomponents selected for Badvel town is shown in Table 1.3.3-2.Table 1.3.3-2: Compliance of Environmental and Forest Rule Regulation forBadvel WaterSupply <strong>Project</strong>Sr. Applicable rules related to sub-project ComplianceRemarksNo. components at Badvel1 Environmental clearance from MoEF or SEIAA Not required Not applicable for water supplyproject2 Forest (Conservation) Act, 1980 – as amended in Not requiredNo forest land involved1988- Forest clearance3 Wildlife Protection Act, 1972 Not required No forest land and wild lifeprotection area nearby the subprojectcomponents4 Consent from State Pollution Control Board Not required Not required for water supplyproject5 The Environment (Protection) Act, 1986 Yes Protection of air and noiseenvironmentduringconstruction & operation6 The Hazardous Wastes (Management And Partly applicable Storage and use of oils,Handling) Rules, 1989emulsions, colour, spentchemicals and Metal-finishingwastes emanating duringconstruction7 <strong>Andhra</strong> <strong>Pradesh</strong> Water, Land and Tree Act, 2002 Yes as per requirement In case of cutting of tress duringinfrastructure construction,permission is required fromULB5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!