12.07.2015 Views

Download - Andhra Pradesh Municipal Development Project Website

Download - Andhra Pradesh Municipal Development Project Website

Download - Andhra Pradesh Municipal Development Project Website

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Comprehensive Planning of Water Supply Service improvements In the following ULBs (1) Ananthapur <strong>Municipal</strong> Corporation,(2) Chittoor <strong>Municipal</strong>ity and (3) Badvel <strong>Municipal</strong>ityBadvel <strong>Municipal</strong>ity – Detailed <strong>Project</strong> Report (Final) - EnvironmentWorking components Location options Selected option Reason of selectionstandards.Water Treatment Plant • Nearby Intake location• Within or near Badveltown• In between any locationNew WTP site selected atHillock beside SPVBR• Land availability near Intake• Cost effective• Flow of raw water for long distance(in case of WTP near Badvel or inbetween place) through pipesaffects pipe longevity• Easier to dispose effluent fromtreatment plant at open intake site/valley area when compared todischarge of effluent near town• Gravity flow without pumpingTransmission/MainRising• The rising main from theWTP will pass along thehill slope to meet theexisting road at a point ofabout 4 Km from B.Mattam village. It willthen follow the sameroad and come to itsjunction with theMydukuru Road. Fromthere it will follow theHighway and supplywater to different ELSRs.• Existing road through B.Mattam village andcome to its junction withthe Mydukuru Road.The rising main from theWTP will pass along the hillslope to meet the existingroad at a point of about 4Km from B. Mattam village.It will then follow the sameroad and come to itsjunction with the MydukuruRoad. From there it willfollow the Highway andsupply water to differentELSRs.• Follow along the Highwayalignment – no impact onagricultural and village land• Easy to access at project sites• No land acquisition is needed (incase of new alignment)• Alignment selected as per designSeven new ElevatedService Reservoirs(ELSRs)Distribution lineSide of Mydukuru road (nearGPO)RTA office compoundBy the side of existing ELSRat Bhavanarayana NagarInside <strong>Municipal</strong> officecompoundBy the side of the existing200 KL ELSR at GandhiNagarBy the side of Kota streetBy the side of existing 150KL GLSR at SundharaihNagarNear 150 KL ELSR atMarutamma NagarNear 60 KL GLSR atChemuduruBy the side of existing 75 KLELSR at Valuru VaripalleWill be provided to everyroad of Badvel havinghabitation7 sites are selected,Inside <strong>Municipal</strong> officecompoundBy the side of the existing200 KL ELSR at GandhiNagarInside old Panchayat officecompound near Kota StreetBy the side of existing 150KL GLSR at SundharaihNagarNear 150 KL ELSR atMarutamma NagarBy the side of existing 60KL GLSR at ChemuduruBy the side of existing 75KL ELSR at ValuruVaripalleWill be provided to everyroad of Badvel havinghabitation• ELSR locations selected on thebasis of design at different zonesand as per the availability of Govt.land for construction of ELSR• These sites are selected becausethey are at a higher ground leveland using these 7 only we canmeet the demand therefore theother reservoirs are not required• Locations are selected to keep inmind present land use andminimization of any impactNo alternatives25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!