12.07.2015 Views

Download - Andhra Pradesh Municipal Development Project Website

Download - Andhra Pradesh Municipal Development Project Website

Download - Andhra Pradesh Municipal Development Project Website

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Comprehensive Planning of Water Supply Service improvements In the following ULBs (1) Ananthapur <strong>Municipal</strong> Corporation,(2) Chittoor <strong>Municipal</strong>ity and (3) Badvel <strong>Municipal</strong>ityDetailed <strong>Project</strong> Report (Final) - Badvel <strong>Municipal</strong>ity –- EnvironmentCONCLUSIONThe project is unlikely to cause significant adverse impacts. The potential adverse impacts that areassociated with design, construction, and operation can be mitigated to standard levels without difficultythrough incorporation or application of recommended mitigation measures and procedures.Sr.No.1 Water Supply Health risk due to closureof water supplySummary of EMP for Badvel Water Supply SchemeImpact Field Impact to Environment Mitigation Measures2 Utilities Impact on telephone lines,electric poles and wires,water pipe (old) existingwithin right-of-way (ROW)3 Social and Ground disturbance canCulturaluncover and damageResources archaeological andhistorical remainsMay affect religiousstructure4 Construction workcamps, spot mixplants, stockpileareas, materialstorage areas,and disposalareas.5 Landscape andAestheticsDisruption to traffic flowaffect social lifeSolid wastes as well asexcess constructionmaterials6 Air Quality Emissions fromconstruction vehicles,equipment, and machineryused for excavation andconstruction resulting todusts and increase inconcentration of vehiclerelatedpollutants such ascarbon monoxide, sulfuroxides, particulate matter,nitrous oxides, andhydrocarbons7 Surface water Mobilization of settled siltqualitymaterials, run-off fromstockpiled materials, andchemical contaminationThere is no chance of closure of present scheme either duringconstruction or during inter connection. Existing serviceconnections will be disconnected after commissioning of the newsystemTelephone lines, power lines etc will be suitably avoided duringpipeline laying(i) Alternatives needs to considered if the site is found to be ofmedium or high risk(ii) Chance finds will be recognised and measures should betaken to ensure they are protected and conserved(iii) Pipe laying nearsensitive receptors in project areas like ,Church – near Nandipall, Mosque – near Old Panchayat Office,Temple – Veeranjaneya Swami temple near Middolapalem,Temple – Pattabhi Ramalyamnear Surendranagar. Temple –Backside of Balaji residence will be bypassed and no impactexpected. Moreover special protection measures will beconsidered during pipe laying, if necessary.(i) Prioritization of areas within or nearest possible vacant space,Few selected areas are, Peddaraju Palli – 10 Km from SagileruRiver- land on both side, Maladurupadu -18 Km from SagileruRiver – 4 acre land on right side while moving from Badvel toWTP, Maladurupadu- 20 Km from Sagileru River, Gunclapuram–21 Km from Sagileru River, Narasimhapuram –22 Km fromSagileru River, and Choudhariwari Palli –27 Km from SagileruRiver(ii) Not to dispose waste in water body nearby(i) Excess earth (approx. 134203 cum) can be disposed in fillinglow lying pockets within the ULB such as Chinna Kessam Palle,Panga Palle, Bakarampeta(South), Gandhi Nagar and otherareas.(ii) Avoid stockpiling of excess excavated soils; and(ii) Coordinate with Badvel <strong>Municipal</strong>ity for beneficial uses ofexcess excavated soils(i) Damp down exposed soil and stockpiles on site by sprayingwater when necessary during dry weather;(ii) Use tarpaulins to cover loose material when transported bytrucks;(iii) Conduct air quality monitoring at sensitive receptors andresidential areas, and(iv) Use only Pollution Under Control certified constructionequipment and vehicle(i) Place storage areas for fuels and lubricants away from anydrainage leading to water bodies;(ii) Wastes generated by construction activities will be disposedin designated sites; and

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!