12.07.2015 Views

Part1 - Andhra Pradesh Municipal Development Project Website

Part1 - Andhra Pradesh Municipal Development Project Website

Part1 - Andhra Pradesh Municipal Development Project Website

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.2 Proposed Sub-project componentsComprehensive Planning of Water Supply Service improvements In the following ULBs(1) Ananthapur <strong>Municipal</strong> Corporation, (2) Chittoor <strong>Municipal</strong>ity and (3) Badvel <strong>Municipal</strong>ityDPR Final – Ananthapur M. C. – Environmenta. Proposed water supply system considered under the present scheme for funding is tabulated anddiscussed below.Table 4.2-1: Details of Proposed Water SupplyName of the Sub-project investmentSource of Water supply (Name and type ofsource)Ground water table at the source (if the source isground water)Distance of source from the target area, final point(in meters)Comprehensive Planning for Water Supply Service Improvementin Ananthapur <strong>Municipal</strong> CorporationSurface water- From Penna Ahobilam Balancing Reservoir(PABR) scheme over the river Penna – No new constructionunder the present schemeNo ground water source will be utilizedNo new plan for source augmentation. Approx. distance fromPABR to Ananthapur 37 kmDetails of water treatment plant, if any? Water treatment plant – No new construction upto 2026.Arrangement for environmental monitoring of thewater quality at different stages of supply,operations of water treatment plant etc., likelaboratory, control room and othersDesign considerations to provide water for futureadditional demand due to increase inpopulation/householdsEnvironmental Monitoring – assessment of raw water fromreservoir and treated water will be done in the laboratory at WTP.Daily and monthly analysis will be done for standard parametersfor assessing drinking water qualityDesign period- 30 yrsIt is assumed that the short term measures will be implementedduring 2011, medium term during 2026 and long term 2040• Per capita domestic supply – 135 lpcd• Institutional & Industrial demand – 5% of domestic demand• Demand for Floating Population – 70 lpcd• Fire Fighting demand in KLD – 100 P 0.5 where P =population in 1000.• UFW – 15% of Total Demand.Raw water demand –• 46.75 MLD or 0.60 TMC (2011)- considering 10% loss• 64.66 MLD or 0.83 TMC (2026)- considering 10% loss• 89.84 MLD or 1.16 TMC (2040)- considering 10% lossA peak factor of 2.5 has been adopted for the design of thedistribution system for 33 zonesRemarks (condition of the existing system, otherthan the proposed)Source- Pandameru HWW- condition of pump is poor, moreovernon availability of water during summer (proposed to bediscarded)Infiltration Well at Tadakleru- non availability of water duringsummer (proposed to be discarded)Bore Well / Infiltration Well at Racha Kalva- , Are in goodcondition but becomes dry when no water is available in the HLC(proposed to be discarded)32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!