12.07.2015 Views

Part1 - Andhra Pradesh Municipal Development Project Website

Part1 - Andhra Pradesh Municipal Development Project Website

Part1 - Andhra Pradesh Municipal Development Project Website

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Comprehensive Planning of Water Supply Service improvements In the following ULBs(1) Ananthapur <strong>Municipal</strong> Corporation, (2) Chittoor <strong>Municipal</strong>ity and (3) Badvel <strong>Municipal</strong>ityDPR Final – Ananthapur M. C. – EnvironmentActions AffectingEnvironmentalResources andvalues (A)Damages toEnvironment (B)RecommendedFeasibleProtectionMeasures (C)aesthetics values to minimize andoffset lossesNoise andVibrationAir pollutionhazardsRunoff pollutionSpills of hazardousmaterials/waste/excess earthImpact on utilityservicesTraffic Congestionat residential andcommercial areasRepairing ofpipelineThe impact on thesocio-economicenvironmentImpact on soilChanges in theland use patternNuisances totravellers andneighboursNuisances andhealth hazards totravellers/workersSerioushealth/safetyhazards to travellersand neighboursSerioushealth/safetyhazards to travellersand neighboursPublicinconvenience dueto disruption ofserviceAccident/nuisanceto publicSerioushealth/safetyhazards toconsumerPositive beneficialeffect likely tostimulate theeconomic growth ofthe areaTemporarytrenching duringrepairingAreas will bedevelopedCareful planningto minimize andoffset lossesControl of motorvehicle andapplicationstringent lawsCareful planningand O&M andcompetentemergencycleanupCareful planningand O&M andcompetentemergencycleanupAppropriateplanning plusprompt actionAppropriate trafficand accesscontrol and safetymeasuresNoSignificantEffect (D1)Problem During Operation StageCareful planningand O&M andcompetentemergency actionInsignificant√Control of runoffsoil/silt and safetyhazard<strong>Development</strong>should be as perIEE (D)Potential SignificantEffectSmall Mod Major(D2) (D3) (D4)√√√√√√√√√√CommentsJoint monitoringby ConstructionContractor andULB is effectiveJoint monitoringby Constructioncontractor andULB is effectiveImmediaterestoration ofroad after fillingup trenchTo the extentfeasible existingutilities will bebypassedDuring jointing,testingtemporaryimpact onsupplyIn consultationwith <strong>Andhra</strong><strong>Pradesh</strong> policetrafficmanagementplan will beprepared40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!