System CommissioningIn <strong>the</strong> commissioning phase, <strong>the</strong> TMEIC team includes<strong>the</strong> field engineers you know and trust, alongside <strong>the</strong>engineer who designed and tested <strong>the</strong> system. Thisoverlap of teams between engineering design and <strong>the</strong>site ensures a smooth and on-schedule startup.The TMEIC service engineer, who is responsible <strong>for</strong>startup and commissioning, and <strong>for</strong> any future servicerequired at <strong>the</strong> site, is part of <strong>the</strong> project team andparticipates in <strong>the</strong> factory system test to becomefamiliar with <strong>the</strong> system. Commissioning is supportedby TMEIC design and service engineers.Commissioning PhasesCommissioning1. Oversee Installation ofElectrical Equipment: 2. Check Out all Wiring &- Motors - Controllers Communication Links, Load- Drives - Cabling & Wiring all Software, & Commission<strong>the</strong> Drives & Motors123. Mill Section Commissioningusing Shadow testing ifnecessary4. Entire Rolling Mill ControlSystem Commissioning usingGhost Rolling if necessary34Teams InvolvedCommissioning Time LineTMEIC offers a single source <strong>for</strong> installation and commissioning. Phases 2, 3, and 4 above are compressed by:• The exhaustive factory acceptance test that includes drives and control system functionality• Training and familiarization of <strong>the</strong> entire team with <strong>the</strong> system at <strong>the</strong> factory• Using shadow testing at <strong>the</strong> mill with system inputs (not outputs) connected to <strong>the</strong> operating plant• Using timesaving Wizards <strong>for</strong> commissioning and drive tune-up• Using ghost rolling to test <strong>the</strong> complete control system without rolling actual productsPage 32 of 40© 2011 TMEIC Corporation. All Rights Reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!