12.07.2015 Views

Joker XL manual - Pichler

Joker XL manual - Pichler

Joker XL manual - Pichler

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

JOCKERInstruction Manual5) When you are sure that everything is aaligned correctly, mix up a generous amountof 30 minute epoxy. Apply a thin layer to theslot in the mounting platform and to the verticalstabilizer mounting area. Apply epoxy tothe lower rudder hinge. Set the stabilizer inplace and re-align. Double check all of yourmeasurements once more before the epoxycures. Remove any excess epoxy using apaper towel and rubbing alcohol and hold thestabilizer in place with T-pins or masking tape.Allow the epoxy to fully cure before proceeding.RUDDER CONTROL HORN INSTALLA-TION.Rudder control horn install as same as theway of aileron control horn. Please see picturesbelow.Rudder control horn.A+B EpoxyPLUS glueC/A glue.C/A glue.Top side.Rudder controlhorn.20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!