13.07.2015 Views

910 aufst - Durkopp Adler AG

910 aufst - Durkopp Adler AG

910 aufst - Durkopp Adler AG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IndexPage:Part 2: Installation Instructions cl. <strong>910</strong>1. Scope of delivery. ............................................. 32. General notes and securing devices ................................. 33. Mounting the stand and the control cabinet3.1 Tabletops................................................... 53.2 Mounting the parts of the stand ..................................... 53.3 Completingthetabletop.......................................... 63.4 Connecting the control box to the main switch ............................. 83.5 Mounting the stand and the reference value transmitter ....................... 93.6 Mounting the oil collector sump ...................................... 103.7 Adjustingtheworkingheight ....................................... 114. Mounting the sewing unit4.1 Mounting the oil pan ............................................ 124.2 Assemblyofthesewingunit........................................ 134.3 Mounting the control panel. ........................................ 144.4 Potential compensation .......................................... 154.5 Mounting the cover hood. ......................................... 1625. Connecting the plug connections to the control box5.1 Plug connections at the multiple pin strip (4-fold) ........................... 175.2 Plug connections at the multiple pin strip (15-fold) ......................... 185.3 Wiring..................................................... 196. Mounting the thread reel holder .................................... 197. Changing the sewing foot and the fabric clamps ......................... 208. Mounting the eye protection ...................................... 219. Oil lubrication9.1 Filling up oil. ................................................. 229.2 Oiling wicks and felt part (connecting rod) ............................... 239.3 Oiling the hook path. ............................................ 2410. Putting into operation10.1 Installationofthemachinesoftware................................... 2510.1.1 General notes ................................................ 2510.1.2 Loading the program ............................................ 2510.1.3 Dongle update via Internet. ........................................ 2610.3 Seamprogram................................................ 2710.4 Sewingtest ............................................. 2811. Optional equipment11.1 Sewinglamp................................................. 291

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!