13.07.2015 Views

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

data.(viii) Plantation shall be raised in an area of 31.528ha including a 7.5m wide green beltin the safety zone around the mining lease, backfilled and reclaimed area, roadsetc. by planting the native species in consultation..4/-with the local DFO/Agriculture Department. The density of the trees should bearound 2500 plants per ha.(ix)(x)(xi)(xii)Effective safeguard measures such as regular water sprinkling shall be carried outin critical areas prone to air pollution and having high levels of SPM and RPMsuch as haul road, loading and unloading point and transfer points. It should beensured that the Ambient Air Quality parameters conform to the norms prescribedby the Central Pollution Control Board in this regard.Regular monitoring of water quality upstream and downstream of KusumdihiNallah, Samij Nallah and other steams, if any shall be carried out and record ofmonitoring data should be maintained and submitted to Ministry of Environmentand Forests, its Regional Office, Bhubneswar, Central Groundwater Authority,Regional Director, Central Ground Water Board, State Pollution Control Boardand Central Pollution Control Board.The project authority shall implement suitable conservation measures to augmentground water resources in the area in consultation with the Regional Director,Central Ground Water Board.Regular monitoring of ground water level and quality shall be carried out in andaround the mine lease by establishing a network of existing wells and constructingnew piezometers during the mining operation. The monitoring should be carriedout four times in a year- pre-monsoon (April-May), monsoon (August), postmonsoon(November) and winter (January) and the data thus collected may besent regularly to Ministry of Environment and Forests and its Regional Office,Bhubaneswar, Central Ground Water Authority and Regional Director, CentralGround Water Board.(xiii) The project proponent shall obtain necessary prior permission of the competentauthorities for drawl of requisite quantity of water (surface water and groundwater) for the project.(xiv)(xv)Appropriate mitigative measures shall be taken to prevent pollution of the KaroRiver in consultation with the State Pollution Control Board.Suitable rainwater harvesting measures on long term basis shall be planned andimplemented in consultation with Regional Director, Central Ground WaterBoard.39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!