13.07.2015 Views

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

submitted to the Ministry as well as to the Regional Office of the Ministry atBhubaneswar.(xv) Regular monitoring of ground water in and around the plant area shall be carriedout, records maintained and periodic reports shall be furnished to the RegionalOffice of this Ministry.(xvi) A green belt of adequate width and density shall be developed around the plantperiphery covering about 1/3 rd of the project area preferably with local species.(xvii) First aid and sanitation arrangements shall be made for the drivers and othercontract workers during construction phase.(xviii) Leq of Noise levels emanating from gas and steam turbines shall be limited to 75dBA. For people working in the high noise area, requisite personal protectiveequipment like earplugs/ear muffs etc. shall be provided. Workers engaged innoisy areas such as steam & gas turbines, air compressors etc shall be periodicallyexamined to maintain audiometric record and for treatment for any hearing lossincluding shifting to non noisy/less noisy areas.(xix) Regular monitoring of ground level concentration of SO 2 , NOx, SPM and RSPMshall be carried out in the impact zone and records maintained. If at any stagethese levels are found to exceed the prescribed limits, necessary control measuresshall be provided immediately. The location of the monitoring stations andfrequency of monitoring shall be decided in consultation with SPCB. Periodicreports shall be submitted to the Regional Office of this Ministry(xx) The project proponent shall advertise in at least two local newspapers widelycirculated in the region around the project, one of which shall be in the vernacularlanguage of the locality concerned within seven days from the date of thisclearance letter, informing that the project has been accorded environmentalclearance and copies of clearance letter are available with the State PollutionControl Board/Committee and may also be seen at Website of the Ministry ofEnvironment and Forests at http://envfor.nic.in.(xxi) A separate environment management cell with qualified staff shall be set up forimplementation of the stipulated environmental safeguards.(xxii) Half yearly report on the status of implementation of the stipulated conditions andenvironmental safeguards shall be submitted to this Ministry/ RegionalOffice/CPCB/SPCB.(xxiii) Regional Office of the Ministry of Environment & Forests located atBhubaneswar will monitor the implementation of the stipulated conditions. Acomplete set of documents including Environmental Impact Assessment Reportand Environment Management Plan along with the additional informationsubmitted from time to time shall be forwarded to the Regional Office for theiruse during monitoring.(xxiv) Separate funds shall be allocated for implementation of environmental protectionmeasures along with item-wise break-up. These cost shall be included as part ofthe project cost. The funds earmarked for the environment protection measures69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!