13.07.2015 Views

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(xxiii) Regular monitoring of the ambient air quality shall be carried out in the impactzone and records maintained. The location of the monitoring stations andfrequency of monitoring shall be decided in consultation with SPCB. Quarterlyreports shall be submitted to the Regional Office of this Ministry.(xxiv) The project proponent should advertise in at least two local newspapers widelycirculated in the region around the project, one of which should be in thevernacular language of the locality concerned within seven days of issue of thisletter, informing that the project has been accorded environmental clearance andcopies of clearance letters are available with the State Pollution ControlBoard/Committee and may also be seen in the Website of the Ministry ofEnvironment and Forests in the http://envfor.nic.in.(xxv) A separate environment monitoring cell with suitable qualified staff should be setup for implementation of the stipulated environmental safeguards.(xxvi) Half yearly report on the status of implementation of the conditions andenvironmental safeguards should be submitted to this Ministry, the RegionalOffice, CPCB and SPCB.(xxvii) Regional Office of the Ministry of Environment & Forests located atBhubaneswar will monitor the implementation of the stipulated conditions. Acomplete set of documents including Environmental Impact Assessment Report,Environment Management Plan and the additional information / clarificationssubmitted subsequently should be forwarded to the Regional Office for their useduring monitoring.(xxviii)Separate funds should be allocated for implementation of environmentalprotection measures along with item-wise break-up. These cost should beincluded as part of the project cost. The funds earmarked for the environmentprotection measures should not be diverted for other purposes and year-wiseexpenditure should be reported to the Ministry.(xxix) Full cooperation should be extended to the Scientists/Officers from the Ministryand its Regional Office at Bhubaneswar/ the CPCB / the SPCB during monitoringof the project.4. The Ministry reserves the right to revoke the clearance if conditions stipulated arenot implemented to the satisfaction of the Ministry.5. The environmental clearance accorded shall be valid for a period of 5 years tostart of production operations by the power plant.6. In case of any deviation or alteration in the project proposed from those85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!