13.07.2015 Views

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(xvi)Appropriate mitigative measures should be taken to prevent pollution of KaroRiver in consultation with the State Pollution Control Board.(xvii) Minerals handling plant shall be provided with adequate number of highefficiency dust extraction system. Loading and unloading areas including all thetransfer points should also have efficient dust control arrangements. These shallbe properly maintained and operated.(xviii) Vehicular emissions shall be kept under control and regularly monitored.Measures shall be taken for maintenance of vehicles used in mining operationsand in transportation of mineral. The mineral transportation shall be carried outthrough covered trucks only and the vehicles carrying the mineral shall not beoverloaded.(xix)(xx)(xxi)Blasting operation shall be carried out only during the daytime. Controlledblasting shall be practiced. The mitigative measures for control of groundvibrations and to arrest fly rocks and boulders should be implemented.Drills shall either be operated with dust extractors or equipped with waterinjection system.Consent to operate shall be obtained from the State Pollution Control Board priorto start of enhanced production from the mine.(xxii) Sewage treatment plant should be installed for the colony. ETP should also beprovided for workshop and wastewater generated during mining operation.(xxiii) The project proponent should take all precautionary measures during miningoperation for conservation and protection of endangered fauna, if any spotted inthe study area and contribute towards the cost of implementation of the planand/or Regional Wildlife Management Plan for conservation of flora and fauna soprepared by the State Forest and Wildlife Department. The amount socontributed shall be included in the project cost. A copy of action plan may besubmitted to the Ministry and its Regional Office, Bhubaneswar within 3 months.(xxiv) A Final Mine Closure Plan along with details of Corpus Fund should be submittedto the Ministry of Environment & Forests 5 years in advance of final mine closurefor approval.B. General conditions(i)No change in mining technology and scope of working should be madewithout prior approval of the Ministry of Environment & Forests...6/-63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!