(xi)(xii)plant, loading and unloading point and transfer points. Extensive water sprinklingshould be carried out on haul roads. It shall be ensured that the Ambient AirQuality parameters conform to the norms prescribed by the Central PollutionControl Board in this regard...4/-The project authority shall implement suitable conservation measures to augmentground water resources in the area in consultation with the Regional Director,Central Ground Water Board.Regular monitoring of ground water level and quality shall be carried out in andaround the mine lease by establishing a network of existing wells and constructingnew piezometers during the mining operation. The monitoring should be carriedout four times in a year ? pre-monsoon (April-May), monsoon (August), postmonsoon(November) and winter (January) and the data thus collected may besent regularly to Ministry of Environment and Forests and its Regional OfficeBhubaneswar, Central Ground Water Authority and Regional Director, CentralGround Water Board.(xiii) The project proponent shall obtain necessary prior permission of the competentauthorities for drawl of requisite quantity of water (surface water and groundwater) for the project.(xiv)(xv)(xvi)Suitable rainwater harvesting measures on long term basis shall be planned andimplemented in consultation with Regional Director, Central Ground WaterBoard.Appropriate mitigative measures shall be taken to prevent pollution of theBaitarni River in consultation with the State Pollution Control Board.Minerals handling plant shall be provided with adequate number of highefficiency dust extraction system. Loading and unloading areas including all thetransfer points should also have efficient dust control arrangements. These shallbe properly maintained and operated.(xvii) Vehicular emissions shall be kept under control and regularly monitored.Measures shall be taken for maintenance of vehicles used in mining operationsand in transportation of mineral. The mineral transportation shall be carried outthrough covered trucks only and the vehicles carrying the mineral shall not beoverloaded.(xviii) Blasting operation shall be carried out only during the daytime. Controlledblasting shall be practiced. The mitigative measures for control of groundvibrations and to arrest fly rocks and boulders should be implemented.(xix)Drills shall either be operated with dust extractors or equipped with waterinjection system.47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!